预应力混凝土连续梁桥施工阶段受力分析研究
[Abstract]:PC continuous box girder bridge has a series of advantages, such as large structural stiffness, small deformation, less expansion joints, wind resistance, strong seismic capacity, simple later maintenance and so on. It is widely used in highway traffic. With the development of high strength materials and hanging basket cantilever construction, PC continuous box girder bridge is also widely used in railway construction. At the same time, with the rise of Midas Civil,ABAQUS 6.12 and other finite element software, the speed and accuracy of structural computer calculation are getting higher and higher, and the overall alignment and stress analysis can also be carried out through the finite element simulation of the construction stage corresponding to the bridge structure. Force analysis of cross section, etc. It provides great help for the construction monitoring and control of PC continuous box girder bridge. However, due to the irreversibility of the construction process of bridge engineering. Moreover, there will be differences between the theoretical calculation results and the actual measurement data in the construction process. This requires technicians to combine theory with practice and do a good job in the monitoring and control of alignment and stress in the process of bridge structure construction. In this paper, combined with Bailazhai No. 1 fourth Line Bridge (324832m continuous beam), the finite element analysis software Midas Civil and ABAQUS 6.12 are used to analyze the stress of the whole structure of the bridge, the linear analysis and the stress analysis of the main control section. The force analysis of the maximum cantilever stage of block 0 is carried out. The calculation results are applied to bridge construction monitoring and control. At the same time, this paper also analyzes the following contents: (1) the characteristics and development course of PC continuous box girder bridge are briefly described, and the current bridge construction monitoring and control theory and construction method are analyzed. (2) the finite element software Midas Civil, is used to establish the spatial three-dimensional finite element model based on the fourth line bridge of Bailazhai No. 1 (324832 m). According to the construction design documents and the characteristics of field engineering, the analysis models of beam section pouring, prestress tension and hanging basket movement in cantilever construction are established, and how to improve the accuracy of finite element model calculation is established. The authenticity is analyzed deeply. (3) the local force of No. 0 block of bridge is analyzed by using the finite element software ABAQUS 6.12 and the loading method of internal force and displacement. The local force of box section under the maximum cantilever state of block 0, the shape of possible cracks and the causes of corresponding cracks are analyzed respectively. (4) the strength of hanging basket and components in cantilever construction is carried out by using Midas Civil. Stiffness and stability analysis, safety factor analysis and structural stress analysis under different load combinations. (5) stress monitoring and linear monitoring are two main contents of field construction monitoring and control of PC continuous beam bridge. A relatively perfect field monitoring system is put forward. The factors that affect the accuracy of construction monitoring and control of PC continuous beam bridge are also analyzed, and the differences between the theoretical calculation results and the actual construction data are compared. This paper puts forward the method of controlling the cantilever stage of hanging basket by constantly adjusting the construction monitoring parameters, which makes a great contribution to the smooth closure of Bailazhai No. 1 fourth Line Bridge, and provides some help for better guiding the construction monitoring of continuous beam bridge.
【学位授予单位】:重庆交通大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U445.4
【相似文献】
相关期刊论文 前10条
1 程光蕴;郑自钧;吴克坚;;盒式录音机按键机构的受力分析[J];江苏机械;1985年02期
2 唐文初,赵英;一种推雪装置的受力分析[J];新疆石油学院学报;2000年04期
3 宋法宝;吴新锋;徐卫;;轻型薄壁桥台受力分析方法探讨[J];公路;2006年07期
4 赵亚溥;孔捧端;;立井施工中多趟管路支承梁的受力分析[J];太原机械学院学报;1986年02期
5 丁肇棣;曲继方;;波齿传动的受力分析和效率计算[J];东北重型机械学院学报;1988年02期
6 周连捷;;圆屋顶的受力分析[J];唐山工程技术学院学报;1989年01期
7 朱为国,尚宁霞;行驶中摩托车的受力分析[J];小型内燃机与摩托车;2005年01期
8 刘相远;;卡客车前桥总成零件的常规受力分析和设计方法[J];汽车零部件;2011年07期
9 刘玉堂;用受力分析方法测定机耕船前导轮三分力[J];拖拉机;1978年03期
10 许其珊;;细纱机罗拉受力分析——应用电子计算机解多支承连续梁的方法[J];华东纺织工学院学报;1984年03期
相关会议论文 前10条
1 肖盛燮;赖明;周裕丰;陈尧民;曾维栋;;考虑局部非线性双链吊桥的受力分析方法[A];中国土木工程学会桥梁及结构工程学会第九届年会论文集[C];1990年
2 何红辉;刘愉强;盛岩峰;林海明;;探讨珠江口浮标标体受力分析计算[A];第二十一届海洋测绘综合性学术研讨会论文集[C];2009年
3 方凡;高尔剑;;单点支承单箱多室连续梁的空间受力分析[A];中国土木工程学会1998年全国市政工程学术交流会论文集[C];1998年
4 徐中豪;;箱型梁大悬臂板的受力分析[A];中国土木工程学会市政工程分会2000年学术年会论文集[C];2000年
5 章锋烽;贾丽君;;琼州海峡大桥三个方案受力分析与性能比较[A];第十九届全国桥梁学术会议论文集(下册)[C];2010年
6 杜以昌;李建英;赖涤泉;;JSBZ132型臂式掘进机工作机构受力分析[A];中国工程机械学会2003年年会论文集[C];2003年
7 戚银生;任宝珍;;新水村尾矿库深埋回水管道受力分析[A];水电与矿业工程中的岩石力学问题——中国北方岩石力学与工程应用学术会议文集[C];1991年
8 彭桂瀚;陈宝春;;广东东莞大汾北水道钢管混凝土拱桥受力分析[A];中国公路学会桥梁和结构工程学会2003年全国桥梁学术会议论文集[C];2003年
9 陈宜言;陈宝春;孙潮;;深圳北站大桥静力受力分析[A];中国钢协钢-混凝土组合结构协会第七次年会论文集[C];1999年
10 刘荣;刘玉擎;;混合梁结合部连接件受力分析[A];中国钢协钢-混凝土组合结构分会第十一次年会论文集[C];2007年
相关重要报纸文章 前2条
1 广元市利州区宝轮第一小学 罗杨成;浅谈受力分析教学[N];广元日报;2011年
2 山东省惠民县第二中学 王兴花;受力分析方法探讨[N];学知报;2011年
相关博士学位论文 前1条
1 吴小刚;交通荷载作用下软土地基中管道的受力分析模型研究[D];浙江大学;2004年
相关硕士学位论文 前3条
1 宋吉;预应力混凝土连续梁桥施工阶段受力分析研究[D];重庆交通大学;2015年
2 孔令峰;钢桁梁桥正交异性钢桥面板受力分析研究[D];北京交通大学;2009年
3 李诚;逆向重构D型打结器运动仿真分析与打结钳嘴受力分析研究[D];中国农业大学;2015年
,本文编号:2487036
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2487036.html