宽幅箱梁桥施工监控和剪力滞效应分析
[Abstract]:During the construction of wide box girder bridge, the transverse deformation of the section is easy to occur, and the difficulty of linear control is increased, and the maximum stress state of the main beam section occurs in the construction stage. Under the influence of shear lag effect, safety accidents are easy to occur in the construction process. Based on the above considerations, this paper takes Fugou Dongguan Bridge, a single box and five chamber continuous beam bridge with a width of 26.5m, as the background project to carry out construction monitoring, and studies the variation law of shear lag in the construction process. The main work completed and the main conclusions obtained are as follows: (1) the single beam model and beam model are established by finite element software Midas/Civil, and the spatial entity element model is established by finite element software Midas/Fea, which provides theoretical data support for the construction monitoring of Dongguan Bridge in Fugou County. (2) the pouring concrete, tensioned prestress and bridge closure in the construction process of Dongguan Bridge in Fugou County are discussed. The influence of system transformation and other construction steps on the section stress and shear lag effect of the main beam is put forward. The stress of the main beam produced by different construction steps shows different "whole" and "local" shear lag effects at the top and bottom plate, and the variation law of shear lag of the cantilever root box girder section in the whole construction process is analyzed. It is concluded that in the process of cantilever construction, the shear lag effect of the section of the main beam before and after pouring concrete increases, and the shear lag effect of the section of the main beam increases, and the shear lag effect of the section of the main beam before and after pouring concrete is weakened by pouring concrete, and the shear lag effect of the section of the main beam before and after the tension prestressed beam is weakened, and the shear lag effect of the bottom plate is increased. The influence of bridge closure and system transformation on shear lag effect is related to beam position. With the construction going on, the compression stress of box girder at the root of cantilever increases and the shear lag effect weakens. (3) according to the characteristics of Dongguan Bridge in Fugou County, the bridge construction monitoring scheme is worked out, and the construction process of Dongguan Bridge in Fugou County is monitored by adaptive control method: the alignment of the main beam is controlled by reasonably setting the elevation of vertical formwork in each stage to ensure the alignment of the main beam in the construction process; By comparing the measured stress results with the theoretical stress results, the reasonable and safe stress of the main beam in the construction process is guaranteed. The monitoring results show that the alignment of the Dongguan Bridge in Fugou County is smooth and achieves the goal of alignment control, and the main beam is in a safe and reliable state during the construction process, and the stress after the completion of the bridge meets the requirements of the code and has a certain safety reserve.
【学位授予单位】:郑州大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:U445.4
【相似文献】
相关期刊论文 前10条
1 覃嘉仕,卢海林;薄壁曲线箱梁通用单元剪力滞效应分析[J];长江大学学报(自科版);2004年Z1期
2 王玲;郄才富;;大跨度预应力混凝土连续箱梁剪力滞效应研究[J];甘肃科技;2010年02期
3 邓德员;陈清波;李新平;;比拟杆法在边箱形主梁剪力滞效应分析中的应用研究[J];科学技术与工程;2012年26期
4 张巧慧;杨先江;孙慧媛;;某桥梁段剪力滞效应研究与分析[J];价值工程;2013年03期
5 卢重阳;;薄壁简支箱梁剪力滞效应参数研究[J];兰州工业学院学报;2013年02期
6 谭中法;;浅谈对剪力滞效应的认识[J];才智;2013年15期
7 丁志全;;负剪力滞效应的研究现状[J];科技资讯;2013年24期
8 李建国;孙逢坤;徐良;;均布荷载作用下简支箱梁的剪力滞效应分析[J];山西建筑;2014年05期
9 郑宇;;刚构-连续组合单箱室桥剪力滞效应分析[J];北方交通;2014年02期
10 于传君,孙玉武;连续弯箱梁桥剪力滞效应分析[J];东北公路;2002年01期
相关会议论文 前10条
1 吴海林;季文玉;许克宾;;箱梁剪力滞效应影响参数分析[A];第九届全国结构工程学术会议论文集第Ⅱ卷[C];2000年
2 赵曼;闫贵平;王新敏;;双线整孔简支箱梁的剪力滞效应分析[A];可持续发展的中国交通——2005全国博士生学术论坛(交通运输工程学科)论文集(下册)[C];2005年
3 蔺鹏臻;刘世忠;;大宽跨比连续钢箱梁桥的剪力滞效应研究[A];第十八届全国桥梁学术会议论文集(下册)[C];2008年
4 王常峰;朱东生;陈兴冲;;双室箱梁桥剪力滞效应分析[A];第十二届全国结构工程学术会议论文集第Ⅲ册[C];2003年
5 张士铎;张启传;;钱塘江三桥恒载箱梁剪力滞效应分析[A];中国土木工程学会桥梁及结构工程学会第十二届年会论文集(下册)[C];1996年
6 梁田;董军;;预应力对曲线矮塔斜拉桥剪力滞效应影响分析[A];第22届全国结构工程学术会议论文集第Ⅰ册[C];2013年
7 周伟;蒋益飞;;斜拉桥最大双悬臂施工阶段主梁剪力滞效应分析[A];江苏省公路学会优秀论文集(2006-2008)[C];2009年
8 张立明;杨昀;徐贺文;;高墩大跨弯桥剪力滞特性分析[A];中国公路学会桥梁和结构工程分会2004年全国桥梁学术会议论文集[C];2004年
9 徐文明;袁端才;蒋志刚;;夹层复合材料薄壁箱形梁剪力滞效应数值分析[A];第17届全国结构工程学术会议论文集(第Ⅱ册)[C];2008年
10 杨允表;石志源;石洞;;复合材料与混凝土复合箱梁的剪力滞效应[A];中国土木工程学会桥梁及结构工程学会第十三届年会论文集(下册)[C];1998年
相关重要报纸文章 前2条
1 本报记者 陈果;广州西塔运用施工监控技术[N];广东建设报;2008年
2 袁弘;请“监工”保质保“靓”建大桥[N];成都日报;2007年
相关博士学位论文 前10条
1 李艳凤;单索面PC斜拉桥主梁剪力滞效应分析研究[D];东北大学;2014年
2 程海根;薄壁箱梁剪力滞效应理论分析与试验研究[D];西南交通大学;2003年
3 王慧东;薄壁箱梁剪力滞效应及其对桥梁行为影响的研究[D];西南交通大学;2007年
4 蔺鹏臻;混凝土箱梁剪力滞效应的分析理论与应用研究[D];兰州交通大学;2011年
5 张永健;考虑剪力滞效应的薄壁结构特性分析[D];长安大学;2007年
6 吴高峰;大跨度箱形梁结构剪力滞效应及非线性抗震性能研究[D];北京化工大学;2005年
7 乔朋;斜拉桥扁平钢箱主梁剪力滞效应研究[D];长安大学;2009年
8 张玉红;薄壁箱梁剪力滞效应的理论分析与试验研究[D];兰州交通大学;2011年
9 卢海林;预应力混凝土曲线箱型梁剪力滞效应理论分析与试验研究[D];天津大学;2007年
10 周月娥;箱型梁剪力滞效应及其可靠度随机有限元分析[D];广西大学;2013年
相关硕士学位论文 前10条
1 杨柄楠;宽幅箱梁桥施工监控和剪力滞效应分析[D];郑州大学;2017年
2 付志方;宽箱连续梁桥施工监控及剪力滞效应研究[D];郑州大学;2015年
3 王金周;单箱三室预应力混凝土连续宽箱梁桥剪力滞效应分析[D];长安大学;2015年
4 扈轩诚;单箱三室波纹钢腹板预应力混凝土箱梁剪力滞效应与腹板剪力分配研究[D];长安大学;2015年
5 宁舟;双边箱主梁拱塔斜拉桥剪力滞效应及施工控制研究[D];长沙理工大学;2014年
6 邓达;薄壁变截面混凝土曲线箱梁施工阶段剪力滞效应分析[D];长沙理工大学;2014年
7 陈祯;纵向预应力对箱梁剪力滞效应影响研究[D];兰州交通大学;2015年
8 李映田;预应力混凝土连续梁的施工监控与剪力滞效应研究[D];兰州交通大学;2015年
9 刘亮;特殊支承箱梁剪力滞效应的有限元分析[D];兰州交通大学;2015年
10 马铋淇;预应力作用引起的箱梁剪力滞效应研究[D];兰州交通大学;2015年
,本文编号:2503356
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2503356.html