不同工法在炭质片岩隧道大变形控制中的应用研究
[Abstract]:Tunnel construction method plays an important role in controlling displacement deformation, resource investment, project progress, construction cost and ensuring the safety of construction and structure. In order to solve the problems existing in the construction of carbon schist tunnel, such as large deformation, collapse, initial support and cracking of secondary lining, the applicability of construction method of sericite carbon schist tunnel under complex geological conditions is studied by taking Banjia tunnel and Guanyazi tunnel of Guzhu expressway as examples. Through the analysis of the construction method of soft rock tunnel, and combined with the geological characteristics of the project and the section size of the tunnel, the construction method is optimized. Through the field verification, it is shown that the three step method, CRD method and bilateral wall pit guide method can effectively control the large deformation of surrounding rock, and the control ability is enhanced in turn. In addition, advance pre-support plays a significant safety role in preventing tunnel collapse.
【作者单位】: 中铁隧道集团一处有限公司;
【分类号】:U455.4
【相似文献】
相关期刊论文 前10条
1 陈花顺;;新蜀河隧道炭质片岩变形特性与支护设计[J];中国铁路;2010年05期
2 陈换利;;长沙至昆明客运专线炭质板岩地段隧道设计初步研究[J];铁道标准设计;2012年09期
3 王维富;;炭质板岩地层隧道施工要点及大变形防治措施[J];隧道建设;2010年06期
4 王更峰;张永兴;熊晓晖;黄达;;深埋大变形隧道炭质板岩蠕变特性试验[J];公路交通科技;2012年09期
5 陈永建;;谈炭质片岩隧道变形原理及三台阶错位施工法[J];山西建筑;2010年04期
6 刘永金;张奇;;花石沟隧道炭质片岩变形特点及控制措施[J];价值工程;2012年10期
7 董杰;蔡亚丽;;炭质片岩地质隧道施工变形控制[J];山西建筑;2011年02期
8 蔡文胜;;襄渝Ⅱ线炭质片岩铁路隧道施工技术研究[J];铁道建筑技术;2010年S1期
9 苟彪;张奕斌;;新蜀河隧道炭质片岩大变形控制技术研究[J];铁道工程学报;2009年11期
10 全民;;宴家炭质片岩隧道塌方综合处治研究[J];铁道建筑;2014年06期
相关硕士学位论文 前4条
1 傅瑞琪;功能化炭质材料的制备及其对Pb(Ⅱ)和Cu(Ⅱ)的去除研究[D];浙江大学;2017年
2 李庆松;炭质板岩大断面隧道围岩稳定分析与控制技术[D];北京交通大学;2014年
3 孙欢欢;炭质板岩隧道围岩变形特性与支护参数研究[D];中南大学;2012年
4 张晓玮;炭质板岩纸坊隧道大变形原因分析及工程实践[D];长安大学;2011年
,本文编号:2524311
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2524311.html