基于关键链的输变电工程进度控制及优化研究
[Abstract]:As an important key state-owned enterprise that has a bearing on the political stability, energy security and economic lifeline of the capital, the Beijing Electric Power Company of China Power Network has optimized the grid structure and enhanced the power supply capacity. Construction of clean energy facilities and other aspects of investment is also increasing, transmission and transformation projects are the most important investment direction. Schedule control and optimization is the focus of power transmission and transformation project management, and it is also one of the main factors that affect the success or failure of power transmission and transformation projects. The progress management level of some dependent power supply companies of Beijing Electric Power Company needs to be improved urgently. 110 kV Honolan Power Transmission and Transformation Project is organized and implemented by Beijing Miyun Power supply Company of State Power Network, which is an important core project of Miyun Power Grid in 2015. There are problems in the progress management of the project. In the project schedule management of power transmission and transformation projects, the critical chain technology is introduced to control and optimize the whole project schedule, which can solve some problems existing in the current project schedule management of power transmission and transformation projects to a certain extent. For example, loss of security time, excessive consumption of resources and so on. This paper adopts the methods of literature, case analysis, inductive analysis and so on, on the basis of expounding the related theories of project schedule management, and combining with the actual situation of project schedule management of power transmission and transformation projects, The characteristics of power transmission and transformation projects and the main methods of schedule control are combed. At the same time, this paper takes the 110kV Honolan power transmission and transformation project as an example, analyzes the present situation of the progress management of the power transmission and transformation project, the existing main problems, and the causes of the problems. On the basis of critical chain theory, the idea of schedule control and optimization of 110kV Honolan power transmission and transformer project is put forward, and the optimization scheme is worked out. The main innovation of this paper is that on the basis of combing the logical relationship of the engineering project, through the introduction of critical chain technology, the progress control optimization is carried out, and the concrete measures of progress control and optimization are put forward. This paper puts forward a feasible project schedule management method of power transmission and transformation project, and finally improves the management performance of the whole project by optimizing the project schedule.
【学位授予单位】:华北电力大学(北京)
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TM72
【参考文献】
相关期刊论文 前10条
1 陈铭;;浅析110kV输变电工程业主项目部管理[J];通讯世界;2016年20期
2 范伟达;曾莎洁;;资源约束条件下工程项目进度管理方法研究[J];建筑经济;2016年10期
3 聂建明;;研究电力系统输变电工程项目管理要点[J];科技与创新;2016年18期
4 王倩倩;;赢得值法在输变电工程管理中的应用分析[J];通讯世界;2016年16期
5 杨政雄;;农村电网输变电工程项目控制管理分析[J];中国高新技术企业;2016年20期
6 白擎;;项目进度管理在输变电工程管理中的应用研究[J];科技尚品;2016年01期
7 张栋;吴尚远;王小滨;;基于目标管理方法的输变电线路工程管理优化研究[J];经营管理者;2015年29期
8 陈楚群;;变电站电气设备安装及调试项目进度管控探究[J];山东工业技术;2015年20期
9 蒋剑川;;输变电工程项目计划管理研究[J];科技与企业;2015年14期
10 徐必庆;;110kV变电站施工项目过程管理[J];通讯世界;2015年12期
相关硕士学位论文 前5条
1 杨娜;楼梓庄110kV输变电工程进度计划与控制研究[D];华北电力大学;2015年
2 王佳科;蟠龙500kV输变电工程进度管理优化研究[D];华北电力大学;2014年
3 陈永宁;110千伏玉井输变电工程项目进度管理研究[D];吉林大学;2013年
4 孙震;河南省电网工程项目进度管理研究[D];华北电力大学;2013年
5 王翔;蒙特卡洛仿真在TD-SCDMA数据网管项目进度管理中的应用[D];上海交通大学;2008年
,本文编号:2439969
本文链接:https://www.wllwen.com/kejilunwen/dianlidianqilunwen/2439969.html