迭代模型在空间项目地面系统的应用

发布时间:2018-07-18 08:23
【摘要】:为了解决传统的瀑布模型面对具有创新性和探索性的空间项目地面应用系统的不适应性问题,本文采用了基于RUP开发方法和分阶段发布策略的迭代模型,并将此方法应用到中方天文卫星(SVOM)科学应用系统中.通过将系统分成3个逐步演变且可以交付使用的系统,与卫星系统研制流程同步,实现地面系统在研制阶段的无缝连接和平滑过渡.同时通过对需求管理工作流程的定义,解决了在原型系统阶段需求识别的一大难题,使得研制工作更加高效合理,最大限度地支持卫星各阶段的定标和测试工作,实现天地同优.
[Abstract]:In order to solve the problem of inadaptability of the traditional waterfall model to the innovative and exploratory space project ground application system, this paper adopts an iterative model based on the Rup development method and the phased release strategy. The method is applied to the Chinese Astronomical Satellite (SVOM) scientific application system. By dividing the system into three gradually evolving systems which can be put into use, and synchronizing with the development process of satellite system, the seamless connection and smooth transition of the ground system in the development phase can be realized. At the same time, through the definition of requirement management workflow, a difficult problem of requirement identification in prototype system stage is solved, which makes the research work more efficient and reasonable, and supports the calibration and test work of each phase of satellite to the maximum extent. The realization of the same heaven and earth is superior.
【作者单位】: 中国科学院国家天文台天文与技术重点实验室;
【基金】:中国科学院空间科学先导专项(编号:XDA04080300)资助项目
【分类号】:V55


本文编号:2131317

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/hangkongsky/2131317.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户f3b98***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com