  本文关键词: 隧道工程 循环进尺 极限平衡法 破坏模式 上限法 非稳定状态 出处:《中国公路学报》2016年04期  论文类型:期刊论文


【摘要】:为了研究隧道开挖过程中循环进尺的合理性和安全性,提出了隧道掌子面与循环进尺相结合的2种破坏模式,即循环进尺段的局部坍塌、掌子面与循环进尺段的整体坍塌,分别采用极限平衡法与上限法推导了循环进尺计算公式。通过综合考虑2种破坏模式下的循环进尺产生条件,建立了非均衡支护压力、黏聚力、内摩擦角等指标之间的相互关系。研究结果表明:循环进尺与掌子面的稳定存在关联,且掌子面的稳定是主控条件,在施工中需重点关注掌子面正前方土体加强;同时,当掌子面与循环进尺处于局部坍塌状态,则循环进尺主要受黏聚力控制,施工中可采用最大循环进尺,如处于整体坍塌,则循环进尺易受各指标影响;实际设计施工中可采用提出的图表优化得到最佳循环进尺。
[Abstract]:In order to study the rationality and safety of circular ruler during tunnel excavation, two failure modes, namely local collapse of circular ruler section, are proposed. The whole collapse of the palmtop surface and the circular ruler section is obtained by using the limit equilibrium method and the upper limit method respectively. The conditions of the cycle ruler generation under two kinds of failure modes are considered synthetically by the method of limit equilibrium and the upper limit method. The relationships among the indexes of unbalanced support pressure, cohesion, internal friction angle and so on are established. The results show that there is a correlation between the stability of the circular ruler and the face of the palm, and the stability of the surface of the palm is the main control condition. In the construction, we should pay more attention to the strengthening of soil in front of the palm; At the same time, when the face of the palm and the circular ruler are in the state of local collapse, the circular ruler is mainly controlled by cohesion force, and the maximum circular ruler can be used in construction. If it is in the whole collapse, the circular ruler is easily affected by each index. In actual design and construction, the proposed chart can be used to optimize the optimal cycle ruler.
【作者单位】: 中南大学土木工程学院;合肥工业大学交通运输工程学院;约瑟夫·傅里叶大学3SR实验室;
【基金】:funded by the National Basic Research Program of China(“973” Program)(No. 2013CB36004) National Natural Science Foundation of China(No.51378510 &51308072)
【分类号】:U455.4
【正文快照】: stability and round length is disregarded[8-9].0 IntroductionThe limit analysis theorem is a useful tool toThe determination of round length,the lengthsolve the stability problem of geotechnical struc-of unsupported span behind

【相似文献】

相关期刊论文 前6条

1 饶金华;对提高坑道掘进循环进尺的体会[J];探矿工程;1988年02期

2 杨小林;隧洞开挖循环进尺的模糊分级统计法分析与研究[J];水利水电技术;2003年02期

3 李波;吴立;左清军;陈剑;袁青;;复杂地质条件下特大断面隧道施工工法及其循环进尺参数的优化研究[J];安全与环境工程;2014年04期

4 杨玉银,段建军,赖世骧;小断面隧洞开挖单循环进尺试验研究[J];四川水力发电;2001年S1期

5 吕鸿,王琼;对编制石方洞挖定额的一点探讨[J];贵州水力发电;2001年S1期

6 ;[J];;年期



本文编号:1445173

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/1445173.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户64102***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com