【摘要】:目前,高速铁路建设在国民经济正以飞快的速度发展,而桥梁体系在高速铁路中被大量采用,预应力混凝土连续梁桥也成为目前应用最为广泛的桥型之一。在高速铁路桥梁施工过程中,桥梁施工监控的重要性逐渐被重视。桥梁施工监控能保证桥梁成桥线形,使桥梁内力满足设计要求,并且还给桥梁预留长期观测点,为桥梁创造终身监测条件,给桥梁运行阶段的养护工作提供科学可靠的数据。 本文系统介绍了桥梁施工监控的目的和方法,并以沪昆高速跨320国道立交特大桥为主要工程研究背景,通过桥梁博士有限元软件建模分析与计算和现场测量与调整,论证了该桥梁的监控效果,并说明了桥梁施工监控在桥梁施工过程中对桥梁线形控制的重要性。文章中还采用灰色系统理论对相关结果进行预测和对相关缺失数据进行估算,在前人的基础上进一步论证灰色理论在桥梁施工监控中的可行性。文章最后还针对该桥梁0#块出现的裂缝,从扭转应力、水泥水化热、外界气温骤变以及日照温差影响四个方面进行分析,运用ANSYS有限元软件建立仿真模型,对各种因素进行比较,分析该裂缝出现的原因,并总结了0#块开裂预防措施。
[Abstract]:At present, the construction of high-speed railway is developing rapidly in the national economy, and the bridge system is widely used in high-speed railway. Prestressed concrete continuous beam bridge has become one of the most widely used bridges at present. In the construction process of high-speed railway bridge, the importance of bridge construction monitoring is paid more and more attention. The internal force of the bridge can meet the design requirements, and the long-term observation points are reserved for the bridge, which will create the monitoring conditions for the bridge for life, and provide scientific and reliable data for the maintenance of the bridge in the operation stage. The purpose and method of bridge construction monitoring are systematically introduced in this paper. Taking the Hu-Kun Expressway 320 National Highway Interchange Bridge as the main engineering research background, the bridge is modeled, analyzed and calculated by the finite element software, and the field measurement and adjustment are carried out. The monitoring effect of the bridge is demonstrated, and the importance of the bridge construction monitoring to the bridge alignment control during the bridge construction is explained. The grey system theory is also used to predict the relevant results and to estimate the missing data. The feasibility of grey theory in bridge construction monitoring is further demonstrated on the basis of predecessors. Finally, according to the cracks in the block of the bridge 0#, from the torsional stress, cement hydration heat, The sudden change of outside temperature and the influence of sunshine temperature difference were analyzed. The simulation model was established by using ANSYS finite element software, the factors were compared, the reason of the crack appeared was analyzed, and the preventive measures of the crack in the block of 0# were summarized.
【学位授予单位】:中南大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:U445.4

【参考文献】

相关期刊论文 前10条

1 张岗;贺拴海;宋一凡;;混凝土箱梁水化热温度损伤安全评价模型研究[J];安全与环境学报;2007年04期

2 王跃西;;混凝土收缩徐变对施工控制的影响[J];甘肃科技;2007年01期

3 刘三元;曹阳;王波;张华兵;张海龙;;薄壁墩混凝土水化热及收缩徐变分析[J];世界桥梁;2006年03期

4 杨秋玲,马可栓;大体积混凝土水化热温度场三维有限元分析[J];哈尔滨工业大学学报;2004年02期

5 方志,刘光栋,王光炯;斜拉桥施工的灰色预测控制系统[J];湖南大学学报(自然科学版);1997年03期

6 林南熏;曾成滋;朱锦年;;混凝土徐变的试验研究[J];华南工学院学报;1965年04期

7 何雄君,沈成武,陈巧生,张航;钢管混凝土拱桥主拱钢管缆索吊装扣索索力调整(英文)[J];武汉交通科技大学学报;1999年05期

8 刘胜春,张开银,沈成武,田晓彬;神经网络方法在大跨度桥梁施工预拱度控制中的应用[J];武汉理工大学学报(交通科学与工程版);2001年03期

9 陈永春;混凝土徐变问题的中值系数法[J];建筑科学;1991年02期

10 方明山;20世纪桥梁工程发展历程回顾及展望[J];桥梁建设;1999年01期



本文编号:1630995

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/1630995.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户b8166***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com