野三河悬索桥施工技术研究

发布时间:2018-05-03 00:21

  本文选题:悬索桥 + 施工技术 ; 参考:《石家庄铁道大学》2015年硕士论文


【摘要】:悬索桥外观优美,但施工过程却较为复杂,涉及诸多问题。悬索桥的施工包括猫道架设、主缆架设、索夹放样、主梁吊装以及风缆架设安装等环节。每个环节的施工质量都直接与全桥的成桥线形和结构受力相关,每个施工环节都会影响施工目标的实现,决定着施工结果能否满足设计要求。因此,对悬索桥的各个施工技术展开研究极为重要。本文依托川气东送野三河悬索桥工程,研究了悬索桥的猫道施工、主缆架设和加劲梁吊装等施工技术。主要内容包括:(1)介绍了国内外悬索桥的发展和应用现状,总结了悬索桥的力学特性和构造特点,指出了悬索桥的不足之处,展望了悬索桥的未来发展趋势;(2)对猫道的结构参数、布置形式进行了讨论。对猫道的架设过程、施工步骤和关键事项作了详细的描述。(3)主缆架设过程中的线形控制是悬索桥成桥线形控制中最重要的一个环节。悬索桥成桥线形取决于主缆的空缆线形。因此,对主缆的施工精度控制必须在架设施工阶段进行,特别是基准束股(1#束股)的架设应进行严格的误差控制。本文对主缆基准束股和一般束股的架设过程和质量控制进行了详细阐述。(4)研究了野三河悬索桥加筋梁吊装施工技术以及施工中的线形控制技术,主要包括索夹放样坐标计算、钢梁架设施工准备、加筋梁吊装施工以及施工过程中的线形监控测量技术等。
[Abstract]:The suspension bridge has a beautiful appearance, but the construction process is complicated, which involves many problems. The construction of the suspension bridge includes the erection of cat Road, the main cable erection, the cable clamp setting, the hoisting of the main beam and the installation and installation of the wind cable. The construction quality of each link is directly related to the bridge alignment and structural stress of the whole bridge, and each construction link will affect the construction. The realization of the target determines whether the construction results can meet the design requirements. Therefore, it is very important to study the construction technology of the suspension bridges. This paper, based on the Three River Suspension Bridge project of the Sichuan gas east to the wild, has studied the construction of the catwalk of the suspension bridge, the main cable erection and the stiffening beam hoisting technology. The main contents include: (1) introducing the suspension at home and abroad. The present situation of the development and application of the cable bridge, summarizes the mechanical and structural characteristics of the suspension bridge, points out the shortcomings of the suspension bridge, and looks forward to the future development trend of the suspension bridge. (2) the structure parameters and layout of the cat road are discussed. The construction process and key items of the cat road are described in detail. (3) the erection of the main cable. The line shape control in the process is the most important link in the line shape control of the suspension bridge. The line shape of the suspension bridge depends on the line shape of the main cable. Therefore, the construction precision control of the main cable must be carried out during the erection construction stage, especially the setting of the reference beam (1# beam) should be strictly controlled. The erection process and quality control of beam strands and common bundles are expounded in detail. (4) the construction technology of stiffened beam in the Sanhe suspension bridge and the line control technology in the construction are studied, including the calculation of the coordinate of the cable clamp, the construction preparation of the girder erection, the hoisting construction of the stiffened beam and the line monitoring and measuring technology in the construction process. Wait.

【学位授予单位】:石家庄铁道大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U445.4;U448.25

【参考文献】

相关期刊论文 前5条

1 王琦;陶翠英;胡浩;;川气东送管道工程野三河跨越悬索桥设计[J];中外公路;2012年05期

2 张志国,邹振祝,赵玉成;确定悬索桥主缆成桥线形的参数方程法[J];计算力学学报;2005年03期

3 孙树山,刘涛,高海峰;大型悬索管道的跨越施工[J];石油工程建设;2002年06期

4 周世忠;江阴长江大桥建设中的重大技术问题[J];桥梁建设;2000年02期

5 潘家英,程庆国;大跨度悬索桥有限位移分析[J];土木工程学报;1994年01期

相关博士学位论文 前2条

1 何为;大跨径悬索桥施工监控中若干问题的研究[D];浙江大学;2006年

2 陈跃;索鞍无预偏施工钢混叠合梁悬索桥施工控制技术研究[D];长安大学;2005年

相关硕士学位论文 前4条

1 张安平;管道悬索结构关键施工步施工控制技术研究[D];武汉理工大学;2010年

2 熊煜明;悬索桥施工控制及关键技术研究[D];长安大学;2008年

3 赵国辉;悬索桥主缆施工牵引系统研究[D];长安大学;2004年

4 梅葵花;悬索桥主缆施工监控的研究[D];长安大学;2000年



本文编号:1836113

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/1836113.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户0946e***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com