大直径顶管隧道穿越浑河安全风险分析
本文选题:顶管 + 隧道工程 ; 参考:《东北大学》2014年硕士论文
【摘要】:随着隧道及地下工程的迅速发展,各类风险事故不断增加。如何在施工中做好防范措施,降低或防止事故的发生已成为亟待解决的问题,因此开展大直径顶管隧道穿越浑河工程风险识别与评估方面的研究具有重要的理论意义与工程应用价值。论文以大直径顶管隧道穿越浑河这段工程为背景,首先结合隧道工程施工的特点,系统地阐述了隧道风险管理的基本理论。通过分析顶管法穿越浑河施工的风险特征和施工的重点难点,运用专家调查法和预先危险性分析法辨识出浅覆土引起隧道塌方涌水等、工作面失稳等风险。其次建立了大直径顶管隧道穿越浑河的安全风险评估体系。结合人-机-环境系统,提出了工程穿越浑河的施工安全风险的主要影响因素包括人-机-环境风险因素、施工设备风险因素、作业人员的风险因素等五个一级影响因素,每个一级影响因素又包含若干二级影响因素。然后运用预先危险性分析法和模糊综合评判法完成了大直径顶管隧道穿越浑河的安全风险评估,得出顶管施工时,在一级影响因素中,穿越河中段和顶管推进阶段的风险最大。在二级影响因素中,浅覆土造成隧道塌方涌水等、工作面失稳、隧道上浮和轴线偏离过大等风险较大。施工时应该注意这几个阶段和因素,提高警惕,提前做好防范,提高施工整体安全性。最后针对大直径顶管隧道穿越浑河工程的施工提出了施工应急预案,在事故发生时能在第一时间采取行动,将损失降到最小。然后建立了顶管法(沈阳地区)施工安全风险管理系统,并将本工程在系统里实现。得出突遇难以逾越的障碍物等为极高风险,需高度重视并规避。管理风险等为高度风险,需采取措施并加强监测。工作井塌方等风险为中度风险,需采取风险处理措施。
[Abstract]:With the rapid development of tunnel and underground engineering, all kinds of risk accidents are increasing. How to do a good job in the construction of preventive measures to reduce or prevent the occurrence of accidents has become an urgent problem, Therefore, it is of great theoretical significance and engineering application value to study the risk identification and evaluation of large diameter pipe-jacking tunnel crossing Hunhe River. Based on the project of large diameter pipe jacking tunnel crossing Hunhe River, the basic theory of tunnel risk management is expounded systematically according to the characteristics of tunnel construction. Based on the analysis of the risk characteristics of pipe jacking method and the key and difficult points in the construction of the Hunhe River, the authors use the expert investigation method and the pre-dangerous analysis method to identify the risks such as the collapse of the tunnel due to shallow overlying soil and the instability of the working face. Secondly, the safety risk assessment system of large diameter pipe jacking tunnel across Hunhe River is established. Combined with man-machine-environment system, the main influencing factors of construction safety risk of engineering crossing Hunhe river include human-machine-environment risk factor, construction equipment risk factor, operator risk factor and so on. Each level of influencing factors also contains a number of secondary factors. Then the safety risk assessment of large diameter jacking tunnel through the Hunhe River is completed by using the method of pre-risk analysis and fuzzy comprehensive evaluation. It is concluded that the risk of crossing the middle section of the river and the stage of pipe jacking is the biggest in the first stage of pipe-jacking construction. Among the secondary influencing factors, the shallow overlying soil causes tunnel collapse, water gushing and so on, the face is unstable, the tunnel floats and the axis deviates too large and so on the risk is great. During construction, we should pay attention to these stages and factors, raise our vigilance, do a good job of prevention in advance, and improve the overall safety of construction. Finally, a construction emergency plan is put forward for the construction of a large-diameter pipe-jacking tunnel crossing the Hunhe River, which can take action at the first time when the accident occurs and minimize the loss. Then the pipe jacking method (Shenyang area) construction safety risk management system is established, and the project is realized in the system. It is concluded that the sudden encounter of insurmountable obstacles is extremely high risk and should be highly valued and avoided. Risk management is high risk, need to take measures and strengthen monitoring. Working well collapse and other risks are moderate risk, need to take risk treatment measures.
【学位授予单位】:东北大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:U455
【相似文献】
相关期刊论文 前10条
1 邱森才;应用顶管法改建娘坑水库涵管的设计与施工[J];人民珠江;2001年06期
2 陈宗波,贾国华,杨磊;顶管工艺在徒骇河城区段治污蓄水工程中的应用[J];山东水利;2004年12期
3 吴征;陈孝湘;杨巡莺;;复杂地质中长大连续顶管设计与施工要点[J];建筑技术;2011年12期
4 刘禹;;泥水平衡法顶管在公路排水工程中的应用[J];山东交通科技;2012年02期
5 李东升;;泥水平衡式顶管法在双孔3m顶管中的应用[J];山西交通科技;2013年01期
6 ;广东省“顶管”技术在水利工程中的应用[J];水利水电技术;1981年01期
7 张昭林;;匈牙利顶管法情况简介[J];市政技术;1983年02期
8 王承德;水下长距离顶管[J];工业建筑;1984年07期
9 龙骥文;“顶管法”在彰湖水库的应用[J];南昌水专学报;1985年00期
10 陈闽;黄永富;鲍柳民;;气压法顶管穿堤施工及沉降控制[J];城市道桥与防洪;2010年08期
相关会议论文 前5条
1 沈晔;祁峰;;长距离顶管的地下对接方法探讨[A];中国土木工程学会水工业分会结构专业委员会四届四次会议论文集[C];2007年
2 祁峰;沈晔;;长距离顶管减摩措施探讨[A];中国土木工程学会水工业分会结构专业委员会四届四次会议论文集[C];2007年
3 成国华;陈峰;;扬州市第五水厂取水顶管工程施工技术[A];施工机械化新技术交流会论文集(第十辑)[C];2009年
4 翟永山;;大粒径卵砾石地层中穿越黄河长距离顶管成套施工技术[A];中国土木工程学会第十五届年会暨隧道及地下工程分会第十七届年会论文集[C];2012年
5 王世高;王灏;;土压平衡顶管施工工艺参数的计算分析[A];城市地下空间开发与地下工程施工技术高层论坛论文集[C];2004年
相关重要报纸文章 前1条
1 本报记者 吴泉海 通讯员 常青 伍宏伟;广州地铁首次采用顶管法 省时省力又省钱[N];广东建设报;2009年
相关博士学位论文 前1条
1 杨仙;管幕预筑法中密排大直径钢管群顶进研究[D];中南大学;2012年
相关硕士学位论文 前10条
1 郑永娟;大直径顶管隧道穿越浑河安全风险分析[D];东北大学;2014年
2 吴绍珍;复杂地层长距离钢顶管设计关键技术研究[D];上海交通大学;2013年
3 彭福泉;长距离大口径钢管顶管施工关键技术的研究与应用[D];西安建筑科技大学;2009年
4 贺昆海;顶管工程关键技术及其实施的风险分析与应用[D];湖南大学;2012年
5 熊翦;矩形顶管关键受力分析[D];中国地质大学(北京);2013年
6 林强强;矩形顶管引起地面变形的实测分析与控制研究[D];同济大学;2008年
7 张云杰;小间距大直径双孔顶管顶进对周围土体的影响[D];哈尔滨工业大学;2013年
8 李方楠;复杂地层平行顶管的环境效应研究[D];上海交通大学;2011年
9 李东风;顶管隧道施工引起地表沉降的有限元法分析[D];安徽理工大学;2015年
10 梁玮真;土压平衡矩形顶管隧道工作面稳定性研究[D];内蒙古科技大学;2015年
,本文编号:1930191
本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/1930191.html