当前位置:主页 > 科技论文 > 交通工程论文 >

高速公路施工绩效评估体系构建研究

发布时间:2018-07-30 08:38
【摘要】:施工阶段是高速公路项目建设的关键环节。在高速公路施工阶段,通过科学评估施工绩效情况,及时发现施工薄弱环节并采取措施加以改善,对提高企业竞争力、实现可持续发展具有重要的意义。首先,简述了研究的背景及项目绩效及施工绩效研究的现状,提出了研究的目标、路线、方法及内容其次,概述了施工绩效评估理论;阐明了施工绩效的概念、内涵及形成机制;描述了施工绩效评估的原则及指标的选取;明确了施工绩效评估的目标;提出了施工绩效评估的管理及技术方法,给出了绩效评估的流程。然后,分析了施工绩效的影响因素、高速公路施工绩效指标体系的构建原则。站在施工全过程绩效评估的视角,以输入、过程、输出三个阶段设计了施工绩效评估体系,每一阶段的绩效指标又从成本、质量、进度三大维度分解为若干细分指标。经文献归纳、合同条款转化、研讨及问卷调研得到初选的绩效指标。通过问卷调查,剔除重要度不高的指标,得到高速公路施工绩效关键指标。应用层次分析法研究了关键绩效指标的权重分配问题,构建了高速公路施工绩效评估体系。最后,以邢汾高速公路XFLJ-13合同段为例,对构建的高速公路施工绩效评估体系进行了应用验证。
[Abstract]:The construction stage is the key link of highway project construction. In the stage of expressway construction, it is of great significance to evaluate the construction performance scientifically, find out the weak links in time and take measures to improve the competitiveness of enterprises and realize the sustainable development. Firstly, the background of the research and the present situation of the research on project performance and construction performance are briefly introduced, and the objectives, routes, methods and contents of the research are put forward. Secondly, the theory of construction performance evaluation is summarized, and the concept of construction performance is clarified. The connotation and forming mechanism; the selection of principles and indicators of construction performance evaluation; the clear objectives of construction performance evaluation; the management and technical methods of construction performance evaluation are put forward, and the process of performance evaluation is given. Then, the paper analyzes the influencing factors of construction performance and the construction principles of expressway construction performance index system. From the point of view of the whole construction process performance evaluation, the construction performance evaluation system is designed in three stages: input, process and output. The performance indicators of each stage are decomposed into several subdivision indicators from the three dimensions of cost, quality and progress. Through literature summary, contract terms transformation, discussion and questionnaire survey to obtain primary performance indicators. By questionnaire survey, the key index of expressway construction performance is obtained by eliminating the index of low importance degree. The weight distribution of key performance indexes is studied by AHP, and the evaluation system of expressway construction performance is constructed. Finally, taking the XFLJ-13 contract section of Xingfen Expressway as an example, the construction performance evaluation system of Xingfen Expressway is verified.
【学位授予单位】:西南交通大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:U415.1

【参考文献】

相关期刊论文 前8条

1 肖限平;;水利工程绩效审计综合评价模型的构建[J];重庆与世界;2011年13期

2 马书红;王圆圆;;公路养护项目实施效果评价体系研究[J];中外公路;2011年03期

3 陈宙翔;;基于模糊综合评价法的公路代建工程绩效考核分析[J];公路;2012年08期

4 冯源;;针对工程项目绩效评价体系的理论分析[J];管理观察;2013年15期

5 曹宗保;;浅谈工程项目人员人力资源绩效管理体系的构建[J];东方企业文化;2014年02期

6 孟宪海;;关键绩效指标KPI——国际最新的工程项目绩效评价体系[J];建筑经济;2007年02期

7 郑生钦;牟强;;改进挣值法在工程项目综合绩效评价中的应用[J];工程管理学报;2013年02期

8 景姣;尹长萍;;工程项目绩效评价方法与实证研究:文献综述及研究展望[J];科学决策;2013年12期



本文编号:2154439

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/2154439.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户27244***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com