超高层建筑结构构筑及使用阶段对紧邻地铁运营隧道的影响分析
发布时间:2018-10-29 10:57
【摘要】:随着城市发展脚步加快,在大城市不可避免地将出现新建高楼大厦紧邻既有地下结构施工的情况。目前国内外相关工程资料较少,对于超高层建筑施工对邻近地下结构物的影响分析尚不多。本文依托北京市国家金融信息大厦(高度360m)紧邻地铁运营隧道施工的实际工程背景,采用MIDAS/GTS通用岩土有限元分析软件对本工程进行了三维数值模拟,针对超高层建筑结构构筑及使用阶段对紧邻地铁运营隧道产生的影响进行了分析研究,得出了隧道变形的一些发展规律。本文的主要工作如下: (1)综述国内外研究现状,指出传统研究方法的不足,尤其是在考虑上部结构受到风荷载时引发隧道的附加变形,国内外对于这方面尚未有明确的研究。 (2)基于本文的工程情况,结合国内相关规范标准,提出近接地铁运营隧道施工控制标准。 (3)对于超高层建筑结构构筑及使用阶段对地铁运营隧道的影响进行了分析,在结构构筑阶段,隧道主要发生竖向沉降,水平位移较小。在建筑使用阶段,考虑风荷载情况下,隧道的沉降和水平变形都会发生变化。 (4)针对建筑与隧道距离,建筑桩长,建筑高度等参数进行了对比分析,总结了隧道保护措施。
[Abstract]:With the acceleration of urban development, it is inevitable that the construction of new high-rise buildings next to the existing underground structure will occur in large cities. At present, there are few related engineering data at home and abroad, and the analysis of the influence of super high-rise building construction on adjacent underground structures is still rare. Based on the actual engineering background of Beijing National Financial Information Building (360m) adjacent to the subway operating tunnel construction, the 3D numerical simulation of the project is carried out by using the MIDAS/GTS general geotechnical finite element analysis software. Based on the analysis of the influence of the construction and use of super high-rise building structure on the adjacent subway operating tunnel, some development rules of tunnel deformation are obtained. The main work of this paper is as follows: (1) the present research situation at home and abroad is summarized, and the shortcomings of the traditional research methods are pointed out, especially the additional deformation of the tunnel caused by the consideration of the wind load on the superstructure. There is no clear research on this aspect at home and abroad. (2) based on the engineering situation in this paper, the construction control standard of the adjacent subway tunnel is put forward. (3) the influence of the construction of super-tall building structure and its use on the subway operating tunnel is analyzed. In the structural construction stage, the tunnel mainly occurs vertical settlement and the horizontal displacement is small. In the stage of building use, the settlement and horizontal deformation of the tunnel will change when wind load is taken into account. (4) according to the distance between the building and the tunnel, the length of the pile and the height of the building, the protective measures of the tunnel are summarized.
【学位授予单位】:北京交通大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:U456.3
本文编号:2297497
[Abstract]:With the acceleration of urban development, it is inevitable that the construction of new high-rise buildings next to the existing underground structure will occur in large cities. At present, there are few related engineering data at home and abroad, and the analysis of the influence of super high-rise building construction on adjacent underground structures is still rare. Based on the actual engineering background of Beijing National Financial Information Building (360m) adjacent to the subway operating tunnel construction, the 3D numerical simulation of the project is carried out by using the MIDAS/GTS general geotechnical finite element analysis software. Based on the analysis of the influence of the construction and use of super high-rise building structure on the adjacent subway operating tunnel, some development rules of tunnel deformation are obtained. The main work of this paper is as follows: (1) the present research situation at home and abroad is summarized, and the shortcomings of the traditional research methods are pointed out, especially the additional deformation of the tunnel caused by the consideration of the wind load on the superstructure. There is no clear research on this aspect at home and abroad. (2) based on the engineering situation in this paper, the construction control standard of the adjacent subway tunnel is put forward. (3) the influence of the construction of super-tall building structure and its use on the subway operating tunnel is analyzed. In the structural construction stage, the tunnel mainly occurs vertical settlement and the horizontal displacement is small. In the stage of building use, the settlement and horizontal deformation of the tunnel will change when wind load is taken into account. (4) according to the distance between the building and the tunnel, the length of the pile and the height of the building, the protective measures of the tunnel are summarized.
【学位授予单位】:北京交通大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:U456.3
【参考文献】
相关期刊论文 前10条
1 闫静雅;;高层建筑物沉降对邻近地铁的影响分析[J];地下空间与工程学报;2009年S2期
2 翟杰群;贾坚;谢小林;;隔离桩在深基坑开挖保护相邻建筑中的应用[J];地下空间与工程学报;2010年01期
3 王如路;刘建航;;上海地铁监护实践[J];地下工程与隧道;2004年01期
4 郭红仙;吴清;宋术双;江波;;紧邻地铁隧道某大厦基础方案有限元分析[J];建筑结构;2006年03期
5 王梦恕;;中国铁路、隧道与地下空间发展概况[J];隧道建设;2010年04期
6 林永国,周正茂,刘国彬;桩基沉降引起地铁隧道位移的治理[J];建筑技术;2001年04期
7 林永国,周正茂,刘国彬,邬松年;单桩沉降遮拦效应的研究[J];同济大学学报(自然科学版);2001年05期
8 楼晓明,刘建航;高层建筑桩基础对邻近隧道影响的监测与分析[J];同济大学学报(自然科学版);2003年09期
9 邱陈瑜;郑颖人;宋雅坤;葛苏鸣;袁晏仁;;桩基荷载作用下隧洞破坏模式研究与安全分析[J];岩石力学与工程学报;2010年S1期
10 戴荣良,陈晖,喻云岩;上海高层建筑桩基土类型特性和沉降分析[J];岩土工程学报;2001年05期
,本文编号:2297497
本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/2297497.html