超高墩大跨连续刚构桥的受力特性与施工控制研究
[Abstract]:With the implementation of the strategy of western development and the investment of the country in the construction of infrastructure, the highway transportation industry is facing a period of rapid development. The mountain landforms are mostly in the southwest of China. The development of high-grade highway in mountainous area can not be separated from the construction of high-pier and long-span bridges, and the huge altitude drop makes the continuous rigid frame bridges with super-high piers and long span have sufficient development space. Compared with the continuous rigid frame bridge with low pier height, the design and construction of super-high pier bridge need to consider more complex structural stress, stability and construction control technology caused by pier height and other factors. Based on the research work of Mahe Bridge, this paper analyzes the influence of the asymmetry of pier height on the stress and deformation of the continuous rigid frame bridge with super high piers under the action of temperature, live load, shrinkage, creep and dead load, including: (1) the influence of temperature, live load, shrinkage, creep and dead load on the structure of continuous rigid frame bridge with super high piers. The internal force of main beam, the stress of bridge pier and the displacement of pier top under different combination of piers are obtained, and some suggestions for structural design are put forward. (2) the stability of continuous rigid frame with super-high piers is discussed. The influence of the height of piers on the stability of the bridge structure under the highest bare pier state, the maximum cantilever state and the bridge completion state is analyzed and discussed. (3) the influence law of the bridge is summarized. The influence of cross beam between two-leg thin-walled piers on structural stability is analyzed. The time of removing the transverse beam of the Mahe Bridge is analyzed theoretically. The results show that the effect of removing the transverse beam on the stability and force of the structure is different under different conditions. It is reasonable to remove the transverse beam between thin-walled piers of Mahe Bridge before the closure section of the side span is locked. (4) based on the theory of temperature effect analysis, The influence of temperature effect on the deformation of bridge structure under the maximum bare pier and the maximum cantilever state is analyzed. The vertical control measures during the construction of the main pier and the control measures to reduce the temperature effect during the construction of the main girder are summarized and put forward. It provides the theoretical basis and control method for the construction process control of the super high main pier and the cantilever of the main beam of the Mahe super bridge, and achieves the good application effect.
【学位授予单位】:重庆交通大学
【学位级别】:硕士
【学位授予年份】:2016
【分类号】:U445.4;U448.23
【相似文献】
相关期刊论文 前10条
1 赵玉泉;田伟雄;;Y型墩连续刚构桥的设计[J];城市道桥与防洪;2009年06期
2 汤伟泉;;论连续刚构桥的施工质量控制[J];广东科技;2011年20期
3 郭帅;苏毅;;大跨度预应力混凝土连续刚构桥设计探讨[J];技术与市场;2012年04期
4 邹昌魏;Y型连续刚构桥设计简介[J];铁道标准设计;1997年01期
5 胡文学,钟永,林增海;连续刚构桥应用中存在问题的探讨[J];广西交通科技;2000年S1期
6 张晟斌;浅析装配式连续刚构桥[J];武汉城市建设学院学报;2000年04期
7 赵宁;有限元理论在连续刚构桥结构分析中的应用[J];黑龙江交通科技;2003年05期
8 林颖,凌怀强,陈炜;连续刚构桥梁主墩设计浅析[J];公路;2004年02期
9 陈福寿;矮墩连续刚构桥的实现[J];公路;2004年06期
10 郑勇,胡大琳,沈永林;轻质高强混凝土在连续刚构桥中的应用分析[J];公路;2005年07期
相关会议论文 前10条
1 赵树森;朱爱生;;连续刚构桥构造形式浅谈[A];第15届全国结构工程学术会议论文集(第Ⅲ册)[C];2006年
2 宁建根;黄海元;;连续刚构桥抗风分析与研究[A];全国城市公路学会第二十一次学术年会论文集[C];2012年
3 陈兴冲;王常峰;夏修身;庄立普;;非对称大跨连续刚构桥线形控制技术研究[A];第19届全国结构工程学术会议论文集(第Ⅱ册)[C];2010年
4 张春宁;;多跨连续刚构桥的结构设计与预应力配束[A];第六届后张预应力学术交流会论文集[C];2000年
5 孔海霞;张喜刚;袁洪;徐麟;李正;高衡;;苏通大桥副桥连续刚构桥设计[A];中国公路学会桥梁和结构工程分会2004年全国桥梁学术会议论文集[C];2004年
6 胡若邻;吕运冰;黄培彦;;连续刚构桥0号块的应力分布特征[A];中国力学学会学术大会'2005论文摘要集(下)[C];2005年
7 黄盛楠;刘英奎;陆新征;叶列平;;大型连续刚构桥梁模型试验及损伤评估[A];第十七届全国桥梁学术会议论文集(下册)[C];2006年
8 周文骏;吴万忠;;连续刚构桥施工期腹板斜向开裂影响因素研究[A];第十九届全国桥梁学术会议论文集(下册)[C];2010年
9 杨岳民;刘士林;;弯—直连续刚构桥施工模拟分析与比较[A];第十一届全国混凝土及预应力混凝土学术交流会论文集[C];2001年
10 项贻强;胡峰强;朱卫国;;三跨预应力混凝土V墩连续刚构桥结构动力分析和试验研究[A];中国公路学会桥梁和结构工程学会2002年全国桥梁学术会议论文集[C];2002年
相关重要报纸文章 前3条
1 记者刘德联 通讯员张玉金 贺佃峰;广深港客专最大跨连续刚构桥合龙[N];中国铁道建筑报;2009年
2 通讯员张绍清 记者蔡崇金;我国单线铁路跨度最大的连续刚构桥桩基完成[N];中国铁道建筑报;2010年
3 本报记者 张仕琴 张俊 冯艳 蒙水;水盘高速:世界第一跨度大桥即将问世[N];经济信息时报;2010年
相关博士学位论文 前8条
1 张利华;高强轻集料混凝土连续刚构桥结构特性研究[D];武汉理工大学;2007年
2 文曙东;连续刚构桥墩壁弹塑性联结梁减震方法研究[D];西南交通大学;2009年
3 牛宏;大跨度连续刚构桥建设期风险分析研究[D];长安大学;2009年
4 文武松;大跨度PC连续刚构桥挠曲开裂因素研究[D];西南交通大学;2009年
5 周淑芬;钢管混凝土桥墩在长联矮墩连续刚构桥中的应用与研究[D];长安大学;2012年
6 周勇军;高墩大跨曲线连续刚构桥梁地震响应的设计参数研究[D];长安大学;2006年
7 叶征伟;山区高墩大跨连续刚构桥风环境及风荷载研究[D];浙江大学;2012年
8 黄志堂;叠合柱高墩大跨连续刚构桥概率地震易损性及风险分析[D];西南交通大学;2015年
相关硕士学位论文 前10条
1 刘遮;连续刚构桥梁的动力优化研究[D];昆明理工大学;2015年
2 陆尧;基于遗传算法的连续刚构桥主梁设计参数优化研究[D];昆明理工大学;2015年
3 唐旭;基于灰色理论的PC连续刚构桥线形控制研究[D];河北工程大学;2015年
4 韦俊旭;公路大跨度预应力混凝土连续刚构桥长期变形的预测[D];西南交通大学;2015年
5 伍波;大跨铁路连续刚构桥等效风荷载研究[D];西南交通大学;2014年
6 刘欣;高墩多跨连续刚构桥高墩刚度匹配问题研究[D];长安大学;2015年
7 杨虎城;预应力混凝土连续刚构桥裂缝分析及加固研究[D];长安大学;2015年
8 武鑫哲;连续刚构桥合龙顶推施工桥墩应力及结构稳定性分析[D];长安大学;2015年
9 闫见华;分箱式连续刚构桥横隔板工序对结构行为的影响研究[D];西南交通大学;2016年
10 石小林;拱加劲连续刚构桥非一致激励地震反应分析及减震研究[D];西南交通大学;2016年