小净距交叉隧道爆破振动控制技术研究
[Abstract]:Based on the project of Zhongchuan Intercity Railway and the North Ring Tunnel of Lanzhou North marshalling Station, this paper takes the Hongshan Tunnel, a project of Lanzhou hub, as the basis of theoretical analysis. Blasting vibration monitoring and numerical simulation are used to systematically study the blasting technology and control measures in the construction of small clear-spaced space crossing tunnel, which provides basic data and theoretical and technical support for design and construction decision. In order to ensure the successful construction of the North Ring Tunnel, and to provide a useful reference for other similar geological conditions of the tunnel construction. The main research contents and conclusions are as follows: (1) the relationship between vibration velocity and dynamic strain is obtained by linear fitting according to the vibration velocity and dynamic strain data obtained from field blasting vibration monitoring. Based on the control standard of allowable tensile stress increment in near-connection construction, it is determined that the safe vibration velocity control standard of blasting vibration is 7.0 cm / s. (2) on the basis of blasting safety regulations and the existing research data of small clear distance tunnel construction, the critical monitoring range of North Ring Tunnel is determined to be 卤20m from intersection point by Saadolski formula. Based on the safety considerations, the total synthetic velocity in three directions is taken as the control standard of blasting vibration velocity, and the maximum vibration velocity of the existing tunnel is 5.89 cm / s when blasting is constructed in the range of 卤20m cross section of the new North Ring Tunnel, and the maximum vibration velocity of the existing tunnel is 5.89 cm / s. Less than the proposed safety speed of blasting vibration. (3) through the analysis of a large number of documents and field measured data, the vibration intensity of blasting is mainly affected by geological conditions, the distance between the blasting centers, the charge quantity, the blasting conditions (the blasting position, the condition of the face near the air), and so on. On the basis of Sadolski's formula and fitting, the empirical formula of blasting vibration suitable for North Ring Tunnel is obtained. Cutting blasting is regarded as the key point of blasting vibration control and monitoring. (4) the spectrum analysis and main frequency distribution analysis of blasting vibration wave pattern are carried out. Through Fourier transform, the typical spectrum chart of blasting vibration signal of North Ring Tunnel is obtained, and the distribution range of main frequency domain of vibration wave is determined. Based on the blasting safety regulations, the main vibration frequency is regarded as the criterion of blasting vibration control standard. It is necessary to strictly control the frequency of blasting vibration wave to avoid the damage caused by resonance. (5) based on the influence factors of blasting vibration intensity, the original blasting scheme is adjusted when passing through the area affected by small net distance. By modifying the borehole design, the charge quantity is controlled, the number of detonation is increased, and the excavation advance is reduced. The blasting vibration effect is reduced to the minimum by selecting reasonable detonator time difference and other methods. (6) the three-dimensional model of cross tunnel with small net distance is established by ANSYS software. By numerical simulation, the maximum vibration velocity of existing tunnel is smaller than that of 7cm/s. Both the tensile and compressive stress and the increment of the tensile and compressive stress of the cross-section lining of the existing tunnel meet the requirements of the code, which shows that the lining structure of the existing tunnel is safe and reliable during blasting. (7) ANSYS finite element software is used to simulate the dynamic response of cutting blasting to the existing tunnel during the step construction of the new tunnel before and after the cross section. The safety of existing tunnel lining is judged by vibration speed and stress. The maximum vibration of existing tunnel lining is less than that of 7cm/s, and the minimum pressure of lining is obtained. The safety factor of tension and the increment of tension and compression stress also meet the safety requirements.
【学位授予单位】:兰州交通大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:U455.6
【相似文献】
相关期刊论文 前10条
1 叶显亮;;隧道爆破施工对附近房屋的振动监测与影响分析[J];贵州大学学报(自然科学版);2010年02期
2 谢兴洋;毛彪;;方家山核电隧道爆破工程概述[J];价值工程;2011年17期
3 程围峰;梁旭;王振宇;;隧道爆破施工对邻近输油管道的影响评价[J];石油工程建设;2011年04期
4 冯义;赵先鹏;马菖林;陈寿根;;临近隧道爆破研究的现行问题分析[J];公路隧道;2011年03期
5 贾世平;;隧道爆破施工对某高压油管的影响分析[J];土工基础;2012年05期
6 吴开才;;实例探析瓦斯隧道爆破设计[J];黑龙江交通科技;2013年09期
7 曹增福,李会祥;使用多种爆破器材进行隧道爆破[J];铁道工程学报;1985年04期
8 王华;市区的隧道爆破工程[J];隧道译丛;1994年03期
9 谢泰极;隧道爆破与直眼掏槽(续)[J];爆破器材;1997年04期
10 李树良;对邻近隧道爆破施工的几点体会[J];铁道建筑技术;1998年04期
相关会议论文 前7条
1 郑大榕;;控制隧道爆破振动研究[A];中国土木工程学会隧道及地下工程学会第八届年会论文集[C];1994年
2 杨年华;魏志韬;;隧道爆破中乳化炸药泵送装填技术及其应用[A];铁路长大隧道设计施工技术研讨会论文集[C];2004年
3 常翔;;侯月铁路云台山隧道爆破技术安全管理浅谈[A];爆破安全技术与管理研讨会论文集[C];2006年
4 王世n
本文编号:2345780
本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/2345780.html