跨海桥梁埋置式基础装配化施工关键技术研究
[Abstract]:In view of the construction conditions of high sea breeze and strong waves, the construction technology of "factory prefabrication and field installation" is adopted for the large foundation of cross-sea bridge, which effectively reduces the working time at sea and improves the construction efficiency at the same time. Taking the assembled foundation of non-navigable hole bridge of Hong Kong-Zhuhai-Macao Bridge as an example, this paper mainly expounds the foundation assembly construction in detail from the overall installation of prefabricated piers and the key construction technology of pile-cap connection, which provides a useful reference for the design and construction of similar bridges in China in the future.
【作者单位】: 中交第二航务工程局有限公司;公路长大桥梁建设国家工程研究中心;中交二航局第二工程有限公司;港珠澳大桥管理局;
【基金】:国家科技支撑计划,项目编号2011BAG07B03
【分类号】:U445.55
【参考文献】
相关期刊论文 前1条
1 林一宁,陈爱萍;跨海大桥的预制构件法施工[J];世界桥梁;2002年04期
【共引文献】
相关期刊论文 前4条
1 苏权科;;跨海大桥特殊技术问题探讨[J];公路交通科技;2005年12期
2 翟世鸿;杨炎华;张照霞;;桥梁深水主墩基础的现状与发展趋势探讨[J];中外公路;2007年06期
3 布占宇;占陈文;石鑫磊;丁勇;;节段拼装混凝土桥墩抗震性能研究[J];宁波大学学报(理工版);2011年02期
4 张强;高宝峰;;港珠澳大桥非通航孔桥型方案分析[J];桥梁建设;2009年04期
相关硕士学位论文 前4条
1 汪铁钧;跨海大桥混凝土连续箱梁桥关键施工技术研究[D];同济大学;2006年
2 瞿振华;跨海大桥下部结构设计与施工技术研究[D];同济大学;2007年
3 赖安静;装配式钢筋混凝土桥墩的力学性能分析[D];沈阳工业大学;2013年
4 何通;预制节段拼装混凝土桥墩抗震性能研究[D];长安大学;2013年
【二级参考文献】
相关期刊论文 前2条
1 龚志刚;大贝耳特海峡联络线中的西桥[J];国外桥梁;1994年02期
2 严国敏;诺森伯兰海峡大桥──加拿大的一座跨海特大桥的计划、设计与施工[J];国外桥梁;1997年02期
【相似文献】
相关期刊论文 前10条
1 郑寿南 ,章明;上海1964年大型壁板住宅试点工程设计介绍[J];建筑学报;1964年08期
2 康师;锦华园的成套技术应用[J];城市开发;2004年12期
3 闻人琪;生产轻型墙板构件的自动组合焊机问世[J];中国建材;1989年10期
4 刘学义;对提高粉煤灰硅酸盐混凝土墙板耐久性的看法[J];工业建筑;1983年10期
5 ;[J];;年期
6 ;[J];;年期
7 ;[J];;年期
8 ;[J];;年期
9 ;[J];;年期
10 ;[J];;年期
,本文编号:2507920
本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/2507920.html