当前位置:主页 > 科技论文 > 施工技术论文 >

KDN船用设备制造企业搬迁项目进度管理研究

发布时间:2019-05-17 15:14
【摘要】:随着船舶制造业的不断发展,船用设备制造企业面临的竞争不断加剧,在《船舶工业调整和振兴规划》的指导下,许多船用设备制造企业实施产业重组,开展企业搬迁项目。如何在保证企业稳定与发展的前提下,建立船用设备制造企业搬迁项目进度管理模式,实现企业生产与搬迁两不误。因此,在搬迁过程中实施合理的项目进度管理显得尤为重要。 项目进度管理包含了项目按时完成所必需实施的各项工程。本文以KDN船用设备制造企业搬迁项目为载体,将理论与实践有机结合,首先通过对船用设备制造企业搬迁项目背景与意义的研究,探讨搬迁过程中的搬迁进度控制难点,并从企业搬迁实际出发,构建船用设备企业搬迁项目进度管理模式。其次详细阐述了项目进度管理相关理论在KDN船用设备制造企业搬迁项目进度计划中的运用,最后论述了运用项目进度控制理论对搬迁项目进行监测、控制的过程。 本文将项目进度管理理论运用在KDN船用设备制造企业搬迁项目的进度管理与控制上,对于提高船用设备制造企业搬迁项目进度管理水平,具有一定的借鉴意义。
[Abstract]:With the continuous development of marine equipment manufacturing industry, the competition faced by marine equipment manufacturing enterprises is becoming more and more intensive. under the guidance of "Shipbuilding Industry Adjustment and Revitalization Planning", many marine equipment manufacturing enterprises carry out industrial restructuring and carry out enterprise relocation projects. On the premise of ensuring the stability and development of the enterprise, how to establish the schedule management mode of the relocation project of the marine equipment manufacturing enterprise, and realize the production and relocation of the enterprise. Therefore, it is particularly important to implement reasonable project schedule management in the process of relocation. Project schedule management includes all the projects necessary for the project to be completed on time. In this paper, the relocation project of KDN marine equipment manufacturing enterprises is taken as the carrier, and the theory and practice are combined organically. Firstly, through the study of the background and significance of the relocation project of marine equipment manufacturing enterprises, the difficulties of relocation progress control in the process of relocation are discussed. According to the reality of enterprise relocation, the schedule management mode of marine equipment enterprise relocation project is constructed. Secondly, it expounds in detail the application of project schedule management theory in the relocation project schedule plan of KDN marine equipment manufacturing enterprises, and finally discusses the process of monitoring and controlling the relocation project by using the project schedule control theory. In this paper, the project schedule management theory is applied to the schedule management and control of the relocation project of KDN marine equipment manufacturing enterprises, which has certain reference significance for improving the progress management level of the relocation project of marine equipment manufacturing enterprises.
【学位授予单位】:南京理工大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:TU722;U673

【参考文献】

相关期刊论文 前10条

1 赵大利 ,赵亚平;我国船用设备制造业发展现状及对策[J];中国创业投资与高科技;2004年11期

2 臧涛;;对工程项目管理中进度管理模式的几点认识[J];发展;2007年08期

3 马国丰,屠梅曾;制约因素在项目进度管理的应用[J];管理工程学报;2002年04期

4 曹惠芬;;“十一五”我国船用设备发展思路与原则探讨[J];船艇;2006年10期

5 王延树,叶旺泉,王春明;项目结构分解在施工管理中的作用及应用[J];基建优化;2000年02期

6 邹琼;;浅论六西格玛在项目进度控制中的应用[J];技术经济与管理研究;2007年01期

7 王剑;;关键链方法在项目进度管理中的应用研究[J];山西建筑;2010年03期

8 丁祥海,唐任仲;项目管理中创新知识管理的研究[J];科研管理;2002年02期

9 刘圣勇;;中外船舶配套产业发展现状分析[J];商业经济;2012年24期

10 杨克斯 ,叶亮军;技术创新的项目管理组织模型[J];企业改革与管理;2004年09期



本文编号:2479198

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/sgjslw/2479198.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户fa8af***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com