襄城县南水北调水厂建设可行性研究

发布时间:2018-03-25 13:51

  本文选题:投资 切入点:可行性 出处:《郑州大学》2016年硕士论文


【摘要】:河南水利投资集团在襄城县投资建设了襄城县南水北调水厂,本文结合工程投资的实际情况,进行了四个方面的研究,第一个方面是针对项目的设计,研究了针对南水北调水源到襄城县之后的水源进行净化的工艺,新增了对地表水藻类爆发期的针对性措施,对于可能会发生的突发性污染事件预留了深度处理预留地;第二方面是对投资进行了估算,针对估算的结果,对投资的可行性进行了经济分析、敏感性分析和生产能力利用率的测算,结果证明项目投资是可行的。第三个方面针对当前政企合作的模式,探索出了DBOT(设计一建设一融资一经营)加特许经营的可持续发展模式,该模式适用于当下倡导的PPP建设投资模式,并节约了流程时间,提高了效率,对企业和政府都有益处,能实现双赢的效果。该模式已经投入了实践并证明该合作模式非常适用于南水北调配套水厂的建设投资,并有推广的价值。第四个方面,针对襄城县的现状,分析了可能会对项目公司的运行产生风险的几个敏感性因素,针对水量、水价带来的风险以及事件风险等等,结合襄城县实际情况对几个风险来源进行分析,给出了参考性的意见。本文对四个问题的研究均得出了可靠的结论,给投资者的决策提供了依据。在将来类似的项目投资中,存在很大的参考价值和实践意义。
[Abstract]:Henan Water Conservancy Investment Group has invested in the construction of Xiangcheng South-to-North Water diversion Plant in Xiangcheng County. Combining with the actual situation of project investment, this paper has carried out four aspects of research. The first aspect is the design of the project. The process of purifying the water source after the South-to-North Water transfer to Xiangcheng County was studied. The corresponding measures were added to the algae eruption period of surface water, and the advanced treatment reserve land was reserved for the sudden pollution event that might occur. The second aspect is the estimation of the investment. According to the result of the estimation, the feasibility of the investment is analyzed economically, the sensitivity analysis and the calculation of the utilization rate of productive capacity are carried out. The results show that the project investment is feasible. The third aspect explores the sustainable development model of DBOT (Design-Build-Fund-Business) plus franchise in view of the current mode of cooperation between government and enterprise. This model is applicable to the current PPP construction investment model, and saves process time, improves efficiency, and benefits both enterprises and governments. The model has been put into practice and proved to be very suitable for the construction investment of the South-to-North Water transfer supporting Water Plant, and has the value of popularization. Fourth, in view of the present situation of Xiangcheng County, the model has been put into practice and proved to be very suitable for the construction investment of the supporting water plant of South-to-North Water transfer Project. This paper analyzes several sensitive factors that may cause risk to the operation of the project company, and analyzes several risk sources according to the actual situation of Xiangcheng county, aiming at the water quantity, the risk brought by water price and the risk of events, etc. In this paper, a reliable conclusion is drawn for the study of four problems, which provides a basis for investors to make decisions. In the future, there will be great reference value and practical significance in similar projects in the future.
【学位授予单位】:郑州大学
【学位级别】:硕士
【学位授予年份】:2016
【分类号】:TV68;TU991.6

【相似文献】

相关期刊论文 前5条

1 ;地方[J];中国建设信息;2011年12期

2 李进卿;何佩佩;;风雨同济 一路辉煌——记襄城县盛寨新型建材有限公司总经理盛群法[J];决策探索(下半月);2012年07期

3 李进卿;何佩佩;;颍汝河畔的守护者——记发展中的襄城县水利局[J];决策探索(下半月);2011年08期

4 李进卿;何佩佩;;为了子孙后代——记襄城县鼎立新型建材有限责任公司董事长刘朴涛[J];决策探索(下半月);2013年11期

5 ;[J];;年期

相关会议论文 前1条

1 高保昌;;襄城县烤烟生产发展振兴之我见[A];中南片2003年烟草学术交流会论文集[C];2004年

相关重要报纸文章 前10条

1 张亚萍 李彦锋;襄城县:全面打响年底收官战[N];许昌日报;2012年

2 李彦锋 付永欣;襄城县:以整改实效取信于民[N];许昌日报;2014年

3 寇小甫;襄城县烟田告别人工浇灌[N];国家电网报;2007年

4 记者 石冠兵 通讯员 张亚萍;襄城县规模以上企业复工复产超过90%[N];许昌日报;2011年

5 记者 蔡忠民 通讯员 卢晓培;襄城县拟修编旅游发展总体规划[N];许昌日报;2011年

6 张亚萍 窦永革;襄城县春来潮涌逐浪高[N];许昌日报;2011年

7 李旭光 黄永钦;襄城县提升基层组织建设水平[N];许昌日报;2011年

8 张亚萍 张魏芳 常雪珍;襄城县城关镇 “软实力”助力项目建设[N];许昌日报;2012年

9 记者 张柯 通讯员 一豪;襄城县43.2亿元投入中心城区建设[N];许昌日报;2012年

10 记者 张沛 通讯员 李彦峰;襄城县:项目建设加速推进[N];许昌日报;2013年

相关硕士学位论文 前3条

1 谢露;1958年襄城县大跃进运动历史考察[D];河南大学;2011年

2 郑林林;襄城县库庄镇农业观光采摘园规划与设计[D];河南农业大学;2015年

3 李广辉;襄城县南水北调水厂建设可行性研究[D];郑州大学;2016年



本文编号:1663408

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/1663408.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户12b6d***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com