本文选题:周宁抽水蓄能电站 + 挑流消能 ; 参考:《水利水电技术》2016年10期
【摘要】:周宁抽水蓄能电站下水库大坝下游河道具有河道狭窄、边坡高陡、天然水深浅的特点,消能建筑物布置条件比较差,且大坝紧靠已建的龙溪二级电站地面厂房,泄洪对其存在不利影响。可行性研究阶段,为研究挑流消能方案的可行性,采用水工模型试验对设计方案进行优化,并对外部影响进行试验分析。通过采取底孔扭曲鼻坎、表孔俯角、下游二道坝+预挖冲坑等多种工程措施成功解决了上述技术难题。试验成果表明,挑流消能造成的下游冲刷、雾化等影响均在合理范围之内,满足本工程要求。
[Abstract]:The downstream channel of the lower reservoir of Zhou - ning Pumped Storage Power Station has the characteristics of narrow channel , high slope , and deep natural water , which is poor in layout conditions of energy dissipation structures , and the dam abutment is close to the already - built Longxi secondary power station ground powerhouse , and the flood discharge has a negative impact on the design scheme . The results show that the influence of downstream scouring , atomization and the like caused by the bottom hole twisted nose can be within a reasonable range and meet the requirements of this project .
【作者单位】: 中国电建集团华东勘测设计研究院有限公司;南京市水利规划设计院股份有限公司;
【分类号】:TV653.3
【相似文献】
相关期刊论文 前10条
1 罗金伟;;龙门滩四级电站大坝挑流消能改进的探讨[J];中小企业管理与科技(上旬刊);2013年04期
2 董艳红;牧振伟;周著;;含沙水流挑流消能对卵石河床冲刷的试验研究[J];东北水利水电;2006年04期
3 柏文;吴建伟;郭磊;鲁文国;;浅析壅水溢流堰在挑流消能中的应用[J];科技信息;2008年26期
4 张帝;刘亚坤;倪汉根;;高坝二级挑流消能研究[J];水利与建筑工程学报;2010年03期
5 付希文;高文红;;中型水库挑流消能工原型试验与验证[J];吉林水利;2011年11期
6 孙申登;;挑流消能计算程序[J];浙江水利科技;1987年04期
7 何振强;;道老都水库软基挑流消能的应用与研讨[J];内蒙古水利科技;1988年03期
8 薛文芳,李瑞珍;挑流消能工几个问题的讨论[J];山西水利科技;1997年S1期
9 吴子荣;挑流消能工程中的几个水力计算问题[J];南昌水专学报;1994年S1期
10 潘瑞文;高坝挑流消能述评[J];云南水力发电;1998年03期
相关会议论文 前1条
1 陈灿辉;卜水发;;黄蜂斗水电站溢流坝挑流消能试验研究[A];第十三届全国水动力学研讨会文集[C];1999年
相关硕士学位论文 前6条
1 董艳红;浑水挑流消能的试验研究[D];新疆农业大学;2006年
2 尤嘉惠;挑流消能风险分析与计算[D];新疆农业大学;2015年
3 陈雪冬;异型斜鼻坎挑流消能试验研究[D];云南农业大学;2015年
4 杨利;溢洪道挑流消能段水气两相流数值模拟研究[D];山东大学;2011年
5 张帝;高坝的二级挑流消能研究[D];大连理工大学;2010年
6 吴鹏;高水头泄水建筑物差动式挑流消能研究[D];新疆农业大学;2009年
,本文编号:1933320
本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/1933320.html