西藏玉曲河扎拉水电站可行性研究报告通过审查
发布时间:2018-06-03 17:06
本文选题:玉曲 + 可行性研究报告 ; 参考:《水力发电》2017年04期
【摘要】:正2017年2月25日~27日,西藏玉曲河扎拉水电站可行性研究报告通过水电水利规划设计总院审查。会议审查认为,报告基本达到了可行性研究阶段勘测设计工作内容和深度的要求。扎拉水电站是玉曲河干流下游河段水电规划7个梯级中的第6级,工程采用混合式开发,坝址位于西藏自治区昌都市左贡
[Abstract]:From February 25 to 27, 2017, the feasibility study report of Yuqu River Zala Hydropower Station in Tibet was examined by the General Hydropower and Water Conservancy Planning and Design Institute. The meeting concluded that the report basically met the requirements of the content and depth of the survey and design in the feasibility study stage. Zala Hydropower Station is the sixth of 7 steps in the hydropower planning of the lower reaches of the Yuqu River main stream. The project adopts mixed development and the dam site is located in Zigong, Changdu City, Tibet Autonomous region.
【分类号】:TV752
,