深埋隧洞围岩及支护结构稳定性研究
[Abstract]:The interaction between surrounding rock and supporting structure has always been a serious and difficult problem in the stability of tunnel engineering. There are many factors that affect the stability of surrounding rock and support system, such as support mode, geological factors and supporting parameters. It is of great significance for the safety and economy of tunnel construction to master the influence of various factors on the surrounding rock and supporting structure. On the basis of consulting a large number of literatures about the construction of the new Austrian tunneling, this paper summarizes the criteria of surrounding rock stability and the factors affecting the stability of surrounding rock, and expounds the characteristics and mechanism of bolting and shotcreting. The calculation principle of finite difference method software FLAC3D is introduced in detail. In view of the general situation of Jiao Fen Ling 1# diversion tunnel project in the central part of Shanxi Province, a three-dimensional numerical model was established by using FLAC3D software, and the supporting effect of bolt and shotcrete in the initial supporting roof arch system was simulated with the help of FLAC3D built-in structure unit. The main research work and the results obtained are as follows: (1) numerical simulation analysis is carried out on the two conditions of tunnel construction and excavation without any supporting measures and early support in time, and the deformation of surrounding rock under the two conditions is compared. The distribution of stress field and the extent of plastic zone are obtained. It is concluded that timely initial support can prevent the further relaxation of surrounding rock and the further expansion of plastic zone. (2) the variation of factors affecting the depth of tunnel, the coefficient of lateral pressure and the level of surrounding rock are analyzed in detail. The deformation of surrounding rock, the distribution of stress field, the size of plastic zone, the stress of initial support and the variation of deformation are studied. The results provide theoretical basis and guidance for the design and construction of similar engineering. (3) the sensitivity analysis of main parameters of surrounding rock is made in this paper. The most sensitive and subsensitive factors of surrounding rock deformation, stress field and plastic zone are obtained. The results show that more attention should be paid to the value of 蠁 and two parameters in numerical analysis, so that the calculation results are more reliable and reasonable. (4) the influence of the thickness of shotcreting layer in the initial support parameters on the stability of surrounding rock support system is calculated and analyzed. It is found that it is not obvious to increase the thickness of shotcrete layer to improve the supporting effect of surrounding rock, and the increase of stress on the jetting layer itself is obvious. Therefore, the thickness of spray layer should be reasonably selected in the design of spray layer, and should not be too large.
【学位授予单位】:浙江工业大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TV554
【相似文献】
相关期刊论文 前10条
1 郭建新;高永涛;;基于软破围岩锚喷支护位移理论的隧道支护时间分析[J];辽宁科技大学学报;2009年05期
2 王庆;郭德发;郭艳;;玛河电站水工隧洞围岩—支护系统非线性分析[J];中国水运(下半月);2010年06期
3 黄祥志;佘成学;;基于可拓和模糊综合评判理论的围岩稳定分类方法的比较[J];中国高新技术企业;2012年Z1期
4 黄运飞,杨维怀;地下工程围岩维护的新途径—切缝弱化围岩法研究[J];重庆大学学报(自然科学版);1988年03期
5 苏有财;白志勇;胡香芳;;综合评判法在围岩等级划分中的应用[J];路基工程;2008年05期
6 刘益锋;任旭华;张继勋;;基于灰关联理论的围岩参数敏感性分析[J];水电能源科学;2012年08期
7 汤伯森;弹塑围岩最小支护抗力和最大允许变形的估算[J];岩土工程学报;1986年04期
8 钟长平,许汉才;围岩松驰变形影响因素初探[J];西安公路交通大学学报;1994年01期
9 郑百功;佴磊;汪茜;陆威;;公路隧道围岩稳定性评价软件开发与应用[J];吉林大学学报(地球科学版);2010年05期
10 王新波;潘晓明;;地下圆形隧道开挖卸荷围岩弹塑性分析[J];河南科学;2010年09期
相关会议论文 前10条
1 齐俊修;刘力;刘克贤;杨国华;;十三陵抽水蓄能电站排风兼安全洞围岩监测及分析[A];岩土力学数值方法的工程应用——第二届全国岩石力学数值计算与模型实验学术研讨会论文集[C];1990年
2 刘宁;朱维申;于广明;;基于Mohr-Coulomb准则的初期支护与围岩耦合作用分析[A];第六届海峡两岸隧道与地下工程学术及技术研讨会论文集[C];2007年
3 倪国荣;张涵浩;李从众;;洞潭水电站球岔设计及球穴围岩稳定分析[A];第一届全国岩石力学数值计算及模型试验讨论会论文集[C];1986年
4 苏有财;谷婷;朱勇;白志勇;;模糊理论在隧道施工阶段围岩等级划分中的应用[A];第三届全国岩土与工程学术大会论文集[C];2009年
5 揭隽夫;;应用围岩分类法评价水工地下洞室围岩稳定的认识[A];地下工程经验交流会论文选集[C];1982年
6 仇文革;;隧道仰拱在支护与围岩交互作用中机理的试验研究[A];第二届全国青年岩石力学与工程学术研讨会论文集[C];1993年
7 齐俊修;王连捷;刘风成;王薇;董诚;;张河湾蓄能电站模型洞围岩位移反分析及预测研究[A];第一届中国水利水电岩土力学与工程学术讨论会论文集(下册)[C];2006年
8 徐平;夏铭佑;;大型地下洞室群围岩稳定三维弹塑性分析[A];第一届海峡两岸隧道与地下工程学术与技术研讨会论文集(上册)[C];1999年
9 庞永祥;;关于圆洞层状围岩的极向应力[A];地下工程经验交流会论文选集[C];1982年
10 孙文召;王丹;李昕;周晶;;水工高压引水隧洞围岩稳定分析[A];水与水技术(第一辑)选编[C];2011年
相关重要报纸文章 前1条
1 黄寰;成都理工大学解开围岩监测难题[N];中国国土资源报;2003年
相关博士学位论文 前6条
1 刘永平;隧道脆性—准脆性围岩连续损伤特征研究[D];吉林大学;2005年
2 张国华;基于围岩累积损伤效应的大断面隧道施工参数优化研究[D];中国科学院研究生院(武汉岩土力学研究所);2010年
3 李景龙;大型地下洞室群工程稳定性风险评估系统及其应用研究[D];山东大学;2008年
4 唐雄俊;隧道收敛约束法的理论研究与应用[D];华中科技大学;2009年
5 冷先伦;深埋长隧洞TBM掘进围岩开挖扰动与损伤区研究[D];中国科学院研究生院(武汉岩土力学研究所);2009年
6 邵勇;采空区多灾耦合作用下的隧道稳定性分析[D];南京大学;2012年
相关硕士学位论文 前10条
1 刘厚银;深埋隧洞围岩及支护结构稳定性研究[D];浙江工业大学;2015年
2 林峰;长距离输水隧洞TBM掘进过程围岩稳定性研究[D];浙江工业大学;2013年
3 刘士雨;地下工程围岩稳定性模糊综合评价及其应用研究[D];华东交通大学;2009年
4 周学良;隧道围岩变形监测与围岩参数的反演分析[D];合肥工业大学;2007年
5 林耿耿;引汉济渭工程控制闸枢纽围岩稳定性研究[D];清华大学;2013年
6 苗萌萌;引观入本工程北台支线引水隧洞围岩稳定性分析[D];辽宁工程技术大学;2013年
7 梁礼绘;高埋深地下洞室围岩稳定性及支护结构研究[D];天津大学;2007年
8 徐浩;隧道开挖对地面建筑物影响的研究[D];重庆交通大学;2010年
9 王向刚;公路隧道位移反演及其稳定性分析[D];山东大学;2005年
10 陈寅奕;深埋隧道复合支护与围岩相互作用分析[D];上海交通大学;2008年
,本文编号:2142588
本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/2142588.html