当前位置:主页 > 科技论文 > 水利工程论文 >

竖式进水口消涡措施试验研究

发布时间:2018-10-20 07:09
【摘要】:针对车马碧水库竖式进水口处出现的立轴旋涡,利用水工模型试验,研究了进口水流流速以及淹没深度对该旋涡的影响,根据研究成果提出修建专门消涡建筑物消除旋涡的方案;结果表明:通过在竖式进水口周围设置12个消涡墩以及在进水口上方设置一消涡盖板组成消涡亭的方式实现在不影响泄流能力以及不过多增加工程量的基础上有效消除竖式进水口处的立轴旋涡的目的。研究成果可为竖式进水口消涡措施的布置提供参考。
[Abstract]:Aiming at the vertical vortex at the vertical inlet of Chemabi Reservoir, the influence of inlet flow velocity and submerged depth on the vortex is studied by hydraulic model test. According to the research results, the scheme of building a special vortex elimination building to eliminate vortex is put forward. The results show that by setting 12 vortex piers around the vertical inlet and a vortex suppression cover plate above the inlet, the vortex suppression pavilion can be realized without affecting the discharge capacity and not increasing the amount of engineering work. The purpose of eliminating vertical vortex at vertical intake. The results can provide a reference for the arrangement of the vortex elimination measures of the vertical intake.
【作者单位】: 云南省水利水电勘测设计研究院;武汉大学水资源与水电工程科学国家重点实验室;
【分类号】:TV131.61

【相似文献】

相关期刊论文 前10条

1 党媛媛;韩昌海;;进水口漩涡问题研究综述[J];水利水电科技进展;2009年01期

2 肖天铎;赵振国;;轴对称减蚀进水口曲面形式[J];水利学报;1959年03期

3 朱咸;轴对称进水口流动的分析和试验研究[J];水利学报;1981年03期

4 章海远;朱庆福;;葛洲坝二号船闸进水口型式选择[J];人民长江;1981年06期

5 孙德根;金忠青;;压板式短进水口的水力计算[J];华东水利学院学报;1986年01期

6 朱鹏程;;论进水口前的冲刷地形[J];人民黄河;1986年03期

7 孙德根;黄细彬;金忠青;;压板式短进水口的优化水力设计[J];河海大学学报;1988年04期

8 杨正,

本文编号:2282423


资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/2282423.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户38289***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com