当前位置:主页 > 科技论文 > 水利工程论文 >

吉音水库混凝土面板堆石坝设计

发布时间:2018-12-06 08:07
【摘要】:正1工程简介吉音水利枢纽工程位于新疆和田地区于田县境内的克里雅河干流吾格也克河上,坝址以上控制流域面积6 375 km~2,是一项以灌溉、防洪为主,兼顾发电的综合性水利工程。吉音水利枢纽工程总库容0.82亿m~3,水库正常蓄水位2 509.00 m,水电站装机24 MW,年发电量1.058亿k W·h。吉音水利枢纽工程为Ⅱ等工程,大坝为永久性雍水建筑物级别为2级。大坝设计洪水标准为100年一遇,洪峰
[Abstract]:The Jiyin Water Conservancy Project is located on the main stream of the Creya River in Yutian County, Xinjiang, China. The area of the basin controlled above the dam site is 6 375 km~2, which is mainly for irrigation and flood control. A comprehensive water conservancy project that takes into account power generation. The total storage capacity of the Jiyin Water Conservancy Project is 82 million mm3, the normal water level of the reservoir is 2 509.00 m, and the power generation of the hydropower station is 105.8 million k W h. per year for 24 MW,. The Jiyin water conservancy project is a second class project, and the dam is a permanent Yongshui structure grade 2. Dam design flood standard is once in 100 years, Hong Feng
【作者单位】: 水利部新疆维吾尔自治区水利水电勘测设计研究院;
【分类号】:TV641.43

【相似文献】

相关期刊论文 前10条

1 雷艳;王康柱;蔡新合;;积石峡水电站混凝土面板堆石坝坝体分区优化设计及坝料调整[J];西北水电;2011年02期

2 梁俊群;卓淳;;南山水库混凝土面板堆石坝坝体分区及坝料设计[J];岩土工程界;2008年02期

3 张伟;;温泉水电站面板堆石坝坝体分区及坝料[J];水科学与工程技术;2013年03期

4 肖化文;水布垭面板坝坝体分区优化设计与龙潭料利用研究[J];水利水电快报;2002年08期

5 郦能惠;;高混凝土面板堆石坝设计理念探讨[J];岩土工程学报;2007年08期

6 ;天生桥一级水电站混凝土面板堆石坝设计[J];红水河;1995年04期

7 苏丽群;天生桥一级水电站混凝土面板堆石坝设计[J];水利水电技术;1998年03期

8 杨建学;查林义;;德泽电站混凝土面板堆石坝设计[J];人民珠江;2009年01期

9 何勤;李劲飞;范金勇;;JLT水电站混凝土面板砂砾-堆石坝坝体分区及坝料设计[J];水利规划与设计;2008年06期

10 庞晓岚,帖建明;海潮坝混凝土面板堆石坝设计特点[J];甘肃水利水电技术;1998年01期

相关会议论文 前3条

1 郦能惠;;高混凝土面板堆石坝设计理念探讨[A];第一届中国水利水电岩土力学与工程学术讨论会论文集(上册)[C];2006年

2 李祖发;;街面水电站混凝土面板堆石坝设计[A];福建省水力发电工程学会2006年学术论文汇编[C];2006年

3 蔡小仁;丁天沛;;黄龙水库混凝土面板堆石坝设计和施工[A];土石坝技术——2008年论文集[C];2008年



本文编号:2365719

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/2365719.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户74be1***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com