蓄水期和运行期库盆变形机制及对高拱坝安全的影响
[Abstract]:At present, high arch dams in China gradually enter the water storage period and operation period. In Jinping stage, the storage process of Xiluodu isobarth arch dam has caused significant deformation of reservoir basin, and there is a sustained contraction of valley amplitude after the completion of storage, which affects the current working behavior and long-term safety condition of high arch dam. There is no systematic evaluation standard for the influence of reservoir basin deformation in arch dam design method. In this paper, the deformation mechanism of fractured rock mass in the early stage of water storage is studied, and the deformation phenomenon of reservoir basin with valley amplitude contraction is preliminarily explained, and a long-term stability evaluation method of high arch dam based on limit analysis is put forward. The main work and innovative results are as follows: (1) the theory of deformation reinforcement is extended to the stability analysis of multi-cracked structures, the whole stability is evaluated by plastic residual energy, and the process of crack initiation, transfixion and failure is analyzed by unbalanced force. The numerical study on compressive failure of test blocks with preset cracks and overloading failure of high arch dams is carried out, and the possibility of cracking of arch dam heel and crack propagation of dam body is analyzed by comparing with the results of model tests. The results show that the method is effective in the stability and crack failure analysis of arch dams. It provides a theoretical basis for the safety evaluation of high arch dams during the storage and operation periods. (2) the deformation law of reservoir basins in the storage period of high arch dams and the reasons for the difficulty in simulating the conventional finite element calculation are summarized. The hydrostatic pressure is considered in the yield condition of elastic-plastic model and applied to the numerical analysis of reservoir deformation in the storage period of Jinping arch dam. The calculated results are compared well with the monitoring results, and the phenomena of valley amplitude contraction and reservoir basin subsidence are preliminarily explained. (3) the mesoscopic mechanism of the pressure action of fissure water is explored. The water pressure in the non-penetrating fracture is a self-equilibrium force system, which changes the equilibrium state of the rock mass and causes plastic deformation of the reservoir basin rock mass. This view is demonstrated by various literatures, monitoring data and calculation results. On this basis, the influence of reservoir basin deformation on the safety of Jinping arch dam during storage period is analyzed, and a preliminary idea for inversion of rock mass strength parameters is put forward. (4) aiming at the safety problem of arch dam under the action of time-dependent deformation of reservoir basin in operation period, the paper analyzes the effect of reservoir basin deformation on the safety of Jinping arch dam. Boundary displacement method and variable stiffness strength reduction method are proposed. The boundary displacement method is based on the elastic plastic model and the rheological model, which is based on the inherent relationship between the elastic-plastic model and the rheological model, and has a complete theoretical basis for simulating the long-term aging deformation of the reservoir basin by applying the fixed displacement at the boundary of the model. The long-term limit state of reservoir basin and high arch dam are analyzed and evaluated by using overload method and strength reduction method respectively. (5) Viscoelastic-plastic rheological constitutive model is used. The deformation of reservoir basin and its influence on dam body during the operation period of Jinping first grade high arch dam are studied numerically. Based on the results of rheological calculation, the boundary displacement method and the strength reduction method with variable stiffness are used to analyze the limit of arch dam. The results show that the long-term deformation of the reservoir basin is beneficial to the overall stability of the arch dam.
【学位授予单位】:清华大学
【学位级别】:博士
【学位授予年份】:2015
【分类号】:TV642.4
【相似文献】
相关期刊论文 前10条
1 陈在铁;任青文;;高拱坝安全分析中的不确定性因素研究[J];南京理工大学学报(自然科学版);2006年06期
2 陈在铁;;高拱坝安全评价方法比较[J];水利水电科技进展;2007年03期
3 唐纯喜;陈进;黄薇;程卫帅;;高拱坝结构安全的风险源集及主要失效路径研究[J];水力发电;2010年11期
4 杨忠兴;;高拱坝关键施工技术[J];四川水力发电;2012年02期
5 黄涛;高拱坝学术讨论会在成都召开[J];水力发电;1981年02期
6 吴本陵;邢振贤;;大掺量粉煤灰在薄壁高拱坝中的应用研究[J];粉煤灰综合利用;1991年04期
7 魏文凯;高拱坝技术的新进展[J];云南水力发电;2000年04期
8 安刚,杨令强;高拱坝泄洪振动水弹性模拟的研究[J];水利水电技术;2001年09期
9 邹丽春,侯顺载,杨宜文;高拱坝地震应力控制标准和抗震工程措施研究[J];水力发电;2001年08期
10 柴军瑞,刘浩吾;高拱坝研究新进展[J];水利水电科技进展;2001年06期
相关会议论文 前10条
1 蒋昱州;徐卫亚;王如宾;石崇;杨圣奇;;高拱坝动力时程分析及安全评价[A];现代水利水电工程抗震防灾研究与进展[C];2009年
2 李毅佳;马斌;;高拱坝地震响应的行波效应分析[A];水力学与水利信息学进展 2009[C];2009年
3 龙渝川;许绍乾;高雪超;;高拱坝梁向配筋抗震措施效果研究[A];第19届全国结构工程学术会议论文集(第Ⅱ册)[C];2010年
4 陈在铁;;基于风险的混凝土高拱坝失效模型研究[A];苏州市自然科学优秀学术论文汇编(2008-2009)[C];2010年
5 余岭;吴杰芳;;高拱坝泄洪诱发坝体振动试验研究[A];第五届全国结构工程学术会议论文集(第三卷)[C];1996年
6 郑璀莹;张国新;;自重施加和蓄水方式对高拱坝应力计算的影响[A];北京力学会第11届学术年会论文摘要集[C];2005年
7 陈在铁;;高拱坝抗震研究急待解决的问题探讨[A];中国力学学会学术大会'2005论文摘要集(下)[C];2005年
8 陈厚群;马怀发;吴胜兴;丁卫华;;高拱坝混凝土地震抗力机理探索[A];2005全国结构动力学学术研讨会学术论文集[C];2005年
9 李同春;王仁坤;游启升;周秋景;;高拱坝安全度评价方法研究[A];2007重大水利水电科技前沿院士论坛暨首届中国水利博士论坛论文集[C];2007年
10 王仁坤;;溪洛渡等特高拱坝的关键技术研究与实践(一)[A];现代水利水电工程抗震防灾研究与进展(2011年)[C];2011年
相关重要报纸文章 前10条
1 毛绍清;练博士“炼”出真功夫[N];西南电力报;2007年
2 本报记者 胡学萃;世界第一高拱坝的崛起[N];中国能源报;2013年
3 丁雅文;世界第一高拱坝左岸混凝土浇筑冲刺坝顶[N];中国建材报;2013年
4 本报记者 胡敏;世界第一高拱坝是这样建设的[N];四川日报;2009年
5 记者 范建;大坝抗震安全设计获新突破[N];科技日报;2008年
6 贾克香邋彭涛;武清玺:一位视讲台如生命的学者[N];中国教育报;2007年
7 通讯员 严镇威;水电十四局4项科技成果通过鉴定[N];云南日报;2010年
8 彭程;“十一五”我国坝工和水电机组技术发展展望[N];中国水利报;2007年
9 中国水利学会水工结构专业委员会;结构工程技术成果丰硕 (下)[N];中国水利报;2003年
10 本报记者 李友明 杨艳;305米:世界第一高拱坝开始浇筑[N];凉山日报(汉);2009年
相关博士学位论文 前10条
1 潘元炜;蓄水期和运行期库盆变形机制及对高拱坝安全的影响[D];清华大学;2015年
2 任炳昱;高拱坝施工实时控制理论与关键技术研究[D];天津大学;2010年
3 姚霄雯;基于性能的高拱坝地震易损性分析与抗震安全评估[D];浙江大学;2013年
4 苏超;基于有限单元法的高拱坝优化设计方法体系的研究与应用[D];河海大学;2005年
5 钟红;高拱坝地震损伤开裂的大型数值模拟[D];大连理工大学;2008年
6 王仁坤;特高拱坝建基面嵌深优化设计分析与评价[D];清华大学;2007年
7 王春涛;高拱坝及其附属结构体系静动力分析与模拟[D];天津大学;2004年
8 陈英儒;变形加固理论及其在高拱坝工程中的应用[D];清华大学;2008年
9 刘毅;高拱坝真实工作性态影响因素研究[D];中国水利水电科学研究院;2007年
10 陈青生;高拱坝坝身泄洪与消能建筑物的优化布置[D];河海大学;2001年
相关硕士学位论文 前10条
1 彭琪;基于模型修正技术的高拱坝结构损伤识别研究[D];南昌大学;2015年
2 赵青;高拱坝异型差动坎与宽尾墩结合消能特性研究[D];大连理工大学;2015年
3 朱昆;高拱坝动力模型破坏试验的数值补充分析[D];大连理工大学;2015年
4 邵勇;基于线弹性断裂力学的高拱坝底缝分析[D];河海大学;2005年
5 卢向丽;高拱坝静、动力分析及开裂研究[D];天津大学;2005年
6 李宁;锦屏高拱坝整体稳定性研究[D];长江科学院;2008年
7 朱晓旭;特高拱坝开裂分析方法与应用[D];清华大学;2011年
8 纪林强;高拱坝承载能力与安全评价研究[D];大连理工大学;2013年
9 潘海琳;高拱坝体形优化决策系统研究[D];河海大学;2006年
10 张优秀;高拱坝承载能力研究[D];武汉大学;2004年
,本文编号:2367300