长距离梯级泵站输水工程经济运行研究
[Abstract]:The cascade pumping station water supply project is a complex system engineering, its design, construction, operation management level will directly affect the safety and economic benefits of the project. This kind of project must save energy and reduce the running cost under the premise of ensuring the safe operation of the system. Based on the existing optimization theory of pumping station and according to the characteristics of a project, the research work on the economic operation of cascade pumping station is carried out in this paper. This paper mainly studies the following aspects: (1) by analyzing the hydraulic characteristics of the water supply system, based on the water head balance equation, the extreme value search method should be applied to the solution of the pump working point. (2) the second and third of a certain project are studied. Flow range of different operation schemes for four stage pump stations. The related data of motor efficiency are studied and the relationship between motor efficiency and frequency and load rate is put forward. (3) aiming at the minimum energy consumption of pumping station, a mathematical model of optimal flow distribution between pumping stations is established. In this paper, a nonlinear programming method is used to study the optimal flow distribution of pump units in a pump station under the condition of asymmetric layout. (4) according to the engineering characteristics of a well group of pumping stations, The mathematical models are established and solved with the minimum power consumption of ten thousand tons of water and the minimum of one side water and electricity charges, respectively. According to the "interim measures for the Management of electricity Price of Sale" and the actual situation of the project, the project chooses the charging method according to the capacity of the transformer, and recommends that the operation scheme with the smallest cost of water and electricity in one side is the most economical operation scheme. Taking the minimum daily electricity charge of well group pump station as the goal, the mathematical model well solution is established, and the most economical operation scheme of well group pump station under different daily water consumption is obtained. (5) taking a cascade pumping station as an example, The economic operation of the whole water supply system is studied. It is concluded that the optimal start-up combination of cascade pumping station and the corresponding frequency conversion pump speed can make the whole water supply system achieve the purpose of economic operation.
【学位授予单位】:西安理工大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:TV675
【参考文献】
相关期刊论文 前10条
1 专祥涛;李明龙;;基于动态规划的梯级泵站优化调度研究[J];自动化与仪表;2016年09期
2 王超;朱满林;李小周;闫天柱;;井群泵站运行优化研究[J];安徽农业科学;2016年09期
3 方国华;曹蓉;刘芹;陈策;;改进遗传算法及其在泵站优化运行中的应用[J];南水北调与水利科技;2016年02期
4 程千;周龙才;冯卫民;许建中;;基于背包模型的泵站优化运行[J];武汉大学学报(工学版);2016年02期
5 李智;刘波波;王新民;刘蒙泰;窦玉颖;;单级泵站不同机组流量分配的优化研究[J];南水北调与水利科技;2015年04期
6 张玉胜;吴建华;刘慧如;孙毅;;具有变频泵的泵站经济运行方式研究[J];水电能源科学;2015年04期
7 马兆龙;桑国庆;张林;;南水北调东线单级泵站日经济运行研究[J];山东水利;2015年03期
8 梁兴;;基于粒子群算法的梯级泵站优化调度研究[J];人民黄河;2015年03期
9 刘磊;肖军;常海晏;;基于遗传算法的城市供水泵站优化调度[J];自动化与仪器仪表;2014年11期
10 周龙才;程千;李娜;;灌区长渠道梯级泵站运行优化及仿真[J];灌溉排水学报;2014年Z1期
相关博士学位论文 前2条
1 朱满林;泵供水系统水锤防护及节能研究[D];西安理工大学;2007年
2 刘梅清;梯级调水系统瞬变流分析及优化调度研究[D];武汉大学;2004年
相关硕士学位论文 前1条
1 李斌;供水工程优化选型及安全经济运行策略研究[D];太原理工大学;2007年