当前位置:主页 > 科技论文 > 水利工程论文 >

引黄济青工程大沽河枢纽改造研究

发布时间:2019-03-11 08:45
【摘要】:引黄济青工程是位于山东省境内的把黄河水引入青岛市,为青岛的工农业发展提供淡水资源的水利工程,具有跨流域和远距离的特点,是山东省“七五”规划的重点项目。自1989年建成以来,工程已顺利运行20余年,但受限于当时的技术水平,许多子工程的功能开始退化,位于胶州市的大沽河枢纽就是其中之一。 本文着眼于社会对引黄济青工程的持续需求,根据大沽河枢纽的现状和暴露出的问题,以笔者多年来学习和工作的经验,对大沽河枢纽提出改造计划,其主要内容包括: 1)参考国内外业界学者对水利枢纽工程相关的研究,对大沽河枢纽水利工程的水文、地质等条件,以及规模、过水量等进行比较,得出对其影响较大的考虑因素。 2)对相关概念,包括水利枢纽等进行梳理,对水利枢纽在通常情况下的改造需求进行论证,对我国水利业界典型的枢纽改造工程进行介绍,梳理其参考价值。 3)对引黄济青工程和大沽河枢纽进行全面介绍,主要对枢纽的现状进行分析,总结其暴露出的各种问题。 4)根据具体情况进行改造设计,针对性地提出相应方案并探讨各个方案的优劣,然后对整个改造计划进行经济、技术、社会方面的可行性分析。
[Abstract]:The Yellow River diversion Project, which is located in Shandong Province, is a water conservancy project which introduces the Yellow River water into Qingdao and provides fresh water resources for the development of industry and agriculture in Qingdao. It is a key project in the Seventh five-year Plan of Shandong Province, which has the characteristics of cross-basin and long-distance. Since its completion in 1989, the project has been running smoothly for more than 20 years, but because of the technical level at that time, the functions of many sub-projects began to deteriorate, one of which is the Dagu River junction located in Jiaozhou City. According to the present situation of Dagu River junction and the problems exposed, according to the continuous demand of the society for the Yellow River diversion Project, this paper puts forward the reform plan for the Dagu River junction based on the experience of the author in studying and working for many years. The main contents are as follows: 1) referring to the domestic and foreign scholars' research on the water conservancy project, the hydrologic, geological and other conditions, as well as the scale and water volume of the Dagu River Project, are compared. The factors which have great influence on it are obtained. 2) to sort out the related concepts, including the hydro-junction, to demonstrate the transformation demand of the hydro-junction under the normal conditions, to introduce the typical project of the hydro-junction transformation in our country, and to sort out its reference value. 3) to introduce the Yellow River diversion Project and Dagu River Project in an all-round way, mainly to analyze the present situation of the project and summarize the problems exposed. 4) carry on the transformation design according to the concrete situation, put forward the corresponding plan pertinently and discuss the pros and cons of each plan, then carry on the economic, technical and social feasibility analysis to the whole reform plan.
【学位授予单位】:山东大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TV68;TV61

【参考文献】

相关期刊论文 前10条

1 曾金鸿;;水利工程质量管理存在的问题及对策分析[J];广东水利水电;2007年04期

2 梁超武;吴舅槐;;花都某水闸过流能力复核分析[J];广东水利水电;2011年08期

3 韩·梅尔;周静;彭晖;;荷兰三角洲:寻找城市规划和水利工程新的融合[J];国际城市规划;2009年02期

4 李U,

本文编号:2438139


资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/shuiwenshuili/2438139.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户a8714***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com