引汉济渭椒溪河隧洞施工通风数值模拟
[Abstract]:In order to alleviate the problem of urban and industrial water shortage along the Weihe River in Guanzhong, Shaanxi Province proposed a large-scale water conservancy project from Hanjiang River to Weihe River Basin in order to alleviate the problem of urban and industrial water shortage along the Weihe River in Shaanxi Province. The Jiaoxi reach project is a cross-river section, the topography and geology are relatively complex, and the ventilation problem during tunnel construction is also relatively serious. The ventilation process of tunnel with branch tunnel is simulated by CFD (Computational Fluid Dynamics) numerical simulation method. The variation of flow field and concentration field with time during construction period is studied under several typical working conditions, and the influence of vortex on air flow and harmful gas distribution in palm surface and branch tunnel is analyzed. When the air flow distribution channel is not smooth, the size and position of the vortex in the vortex area near the palm surface change periodically, and the influence range decreases gradually with the increase of ventilation time. The harmful gases and soot produced by tunnel blasting will move and spread with the flow of air flow, and will be gradually discharged out of the hole. Through the study of the exhaust process of air flow and harmful gas in the main tunnel and branch tunnel of the tunnel, it is concluded that the vortex zone is formed near the palm surface of the tunnel under the action of ventilation and at the intersection position between the branch tunnel and the main tunnel. The generation and change of the vortex continuously consume the mechanical energy of ventilation, reduce the ventilation efficiency, and cause a certain blocking effect on the drainage of harmful gases. The drainage process of harmful gases in the tunnel includes movement and diffusion. The CO is discharged outside the tunnel in the process of movement, and the peak value of CO in the tunnel is continuously reduced in the diffusion process. The time to reach the safe concentration in the tunnel under different working conditions is summarized, and some reference suggestions for the construction progress of the tunnel are given.
【作者单位】: 西安理工大学西北旱区生态水利工程国家重点实验室培育基地;
【基金】:国家自然科学基金(51679197) 陕西省重点科技创新团队(2013KCT-015)~~
【分类号】:TV554
【相似文献】
相关期刊论文 前10条
1 张亚莲;丁娟兰;;隧洞施工中线放样三角坐标法简析[J];科学咨询(决策管理);2008年06期
2 祝晗英;;小断面长隧洞施工中常见问题与处理措施[J];陕西水利;2009年02期
3 高晓猛;;谈水利工程隧洞施工管理[J];黑龙江科技信息;2012年28期
4 刘宏超;刘贵雄;;引汉济渭隧洞施工若干技术问题探讨[J];电网与清洁能源;2012年11期
5 ;各国修建的一些大型隧洞施工资料[J];人民长江;1965年02期
6 肖晓桂;隧洞施工成套设备[J];水利水电快报;1996年11期
7 李胜勇;红岩隧洞病害整治方案探索[J];四川水利;2000年06期
8 车天发;少陵塬隧洞施工降水规律的试验研究[J];地下水;2001年02期
9 周清,孙博,吴中伟;“新奥法”在东江—深圳供水改造工程观音山隧洞施工中的应用[J];华北水利水电学院学报;2001年04期
10 白涛,成晓云;三维双程导线重复测量在隧洞施工控制中的应用[J];西北水力发电;2002年02期
相关会议论文 前7条
1 和再良;钱东宏;;罗碧电站隧洞的施工监测及设计反馈[A];全国岩石边坡、地下工程、地基基础监测及处理技术学术会议论文选集[C];1993年
2 邵正权;罗毅;;隧洞施工中涌水问题的预防与处理[A];水与水技术(第3辑)[C];2013年
3 祈宁春;;高压大涌水、高地应力隧洞施工技术探索——锦屏水电站辅助洞施工[A];中国岩石力学与工程实例第一届学术会议论文集[C];2007年
4 吴静;葛浩然;;软弱破碎地质条件下的隧洞施工[A];2008中国水力发电论文集[C];2008年
5 王高荣;;浅谈放水隧洞开挖施工方法与管理[A];2013年4月建筑科技与管理学术交流会论文集[C];2013年
6 刘斌;李卫兵;;TBM隧洞施工超前地质预报方法对比分析[A];中国水利学会地基与基础工程专业委员会第十一次全国学术技术研讨会论文集[C];2011年
7 罗西北;李志超;;南水北调西线跨流域调水的市场化运作与高埋深长隧洞施工技术问题[A];中国水利学会2001学术年会论文集[C];2001年
相关重要报纸文章 前10条
1 通讯员 郝继峰;上游线隧洞盾构机正式掘进[N];中国水利报;2008年
2 裴景峰;太重隧洞管道安装车及技术通过鉴定 [N];中国冶金报;2002年
3 本报记者 郭纯 毕鹏飞;苏子河畔的舞龙者[N];中国水利报;2008年
4 姜书范 伍振 杨勇;为了庄严的承诺[N];中国铁道建筑报;2009年
5 本报记者 杨秀权 通讯员 刘培荣;用抗灾精神搞复建[N];中国铁道建筑报;2009年
6 本报通讯员 汤少林;引红济石:高科技支撑快进度[N];中国水利报;2009年
7 ;跨越铸精品 卓越创一流[N];中国水利报;2008年
8 记者 李锦兰;世界最先进掘进机首进云南[N];云南经济日报;2003年
9 周安才;大川水电站:一段难忘的经历[N];经理日报;2009年
10 记者 王永锋 通讯员 任文吉;佛坪:一条河堤保护了全县三分之一人口[N];陕西日报;2011年
相关硕士学位论文 前4条
1 王鹏;层状围岩隧洞施工爆破数值模拟分析[D];新疆农业大学;2013年
2 姚晓明;TBM在超长隧洞施工方法研究[D];西南交通大学;2011年
3 张克强;盾构技术在黄土隧洞施工中的应用研究[D];西安理工大学;2004年
4 黄柏洪;岩体全断面隧洞施工技术及支护方案研究[D];河海大学;2006年