高层住宅装饰与安装阶段的施工工序流程再造研究

发布时间:2018-02-26 17:31

  本文关键词: 施工工序 流程再造 案例分析 成本 进度 质量 安全 出处:《山东建筑大学》2015年硕士论文 论文类型:学位论文


【摘要】:建筑施工过程中施工工序的流程再造,是指施工企业对某一具体施工过程中的工作顺序进行资源、组织的整合优化,以达到“成本降低、进度加快、质量达标、安全保证”的目标。目前,施工企业在装饰与安装阶段,会由于施工工序不合理的设计和管理,出现人工、材料、机械设备的消耗浪费,施工效率降低、施工成本加大、工期进度延长、施工任务无法按照计划完成。在装饰与安装阶段,施工工序繁琐复杂,施工班组多,平行、交叉作业多,作业时间与空间相互影响,工作时间和资源冲突与闲置的现象频发。对装饰与安装阶段的施工工序进行流程再造,对提高施工企业的施工生产效率有着现实意义。本文基于流程再造原理,结合中铁十二局经纬嘉园项目的案例分析,通过对装饰与安装阶段优化前施工工序及优化和改进后施工工序流程的成本、进度、质量、安全的测算、分析和比较,进行数据定性定量的分析和理论推导,以寻求最合理可行的施工工序调整方案,并分析装饰与安装阶段工序流程优化的影响因素及实施的可行性,便于施工企业进行更加合理有效的进行施工工序安排。
[Abstract]:The process reengineering of the construction process in the construction process refers to the construction enterprise carries on the resources to a certain concrete construction process work sequence, organizes the conformity optimization, in order to achieve "the cost reduces, the progress speeds up, the quality reaches the standard," At present, because of the unreasonable design and management of the construction process, the consumption of labor, materials, machinery and equipment will be wasted, the construction efficiency will be reduced, and the construction cost will be increased. In the decoration and installation stage, the construction procedure is complicated and complicated, the construction teams are many, parallel, the cross operation is more, the operation time and space influence each other, The conflicts and idle phenomena of working time and resources occur frequently. It is of practical significance to improve the construction efficiency of construction enterprises by reengineering the construction process in the decoration and installation stage. This paper is based on the principle of process reengineering. Combined with the case study of Jingwei Jiayuan Project of China Railway 12 Bureau, the cost, schedule, quality and safety of the construction process before and after the optimization and improvement of decoration and installation are measured, analyzed and compared. Qualitative and quantitative analysis and theoretical derivation of data are carried out in order to find out the most reasonable and feasible adjustment scheme of construction procedure, and analyze the influencing factors and feasibility of process optimization in decoration and installation stage. It is convenient for the construction enterprise to arrange the construction procedure more reasonably and effectively.
【学位授予单位】:山东建筑大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TU767;TU71

【参考文献】

相关期刊论文 前3条

1 王冬冬;;基于Petri网的建筑施工流程优化建模[J];淮阴工学院学报;2006年01期

2 肖乐英;;高层建筑施工流程管理分析[J];价值工程;2013年02期

3 张志红;;企业流程优化探析[J];职业时空;2009年09期



本文编号:1539041

资料下载
论文发表

本文链接:https://www.wllwen.com/wenyilunwen/shinazhuanghuangshejilunwen/1539041.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户0f912***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com