当前位置:主页 > 管理论文 > 生产管理论文 >

长沙-郴州成品油管道项目经济可行性研究

发布时间:2018-01-09 10:00

  本文关键词:长沙-郴州成品油管道项目经济可行性研究 出处:《湖南大学》2013年硕士论文 论文类型:学位论文


  更多相关文章: 项目评价 经济可行性 管道项目


【摘要】:随着湖南市场对成品油的需求日益增大,油品的运输环节制约销售的问题将日趋严重。目前,湖南省成品油资源供应需要从株洲通过铁路或公路进行二次运输,铁路、公路运输存在运输成本高、损耗大、繁忙期间输送不畅等问题。与之相比,管道运输方式则具有运输组织难度小、安全可靠性较高等优势。为了优化湖南成品油物流供应体系,保障市场供应安全,中国石化湖南石油公司计划进一步扩展成品油管道网络。 本文以湖南石油公司拟建的长沙-郴州成品油管道项目为研究对象,对该项目的经济可行性进行分析。首先,本文在对该管道项目进行内外部环境分析的基础上,结合项目的建设规划对项目的投资成本与运行成本进行了分析;其次,文章讨论了项目投入使用后的油品资源配置情况,并以此为基础对项目的未来收益做出测算,对项目经济效益进行了分析。最后,针对项目实施过程中可能遇到的问题,从组织管理与技术保障两个大的方面提出了使项目正常进行的保障措施。 本文的研究将为长沙—郴州成品油管道项目的经济决策提供支持,为项目进入运营期提供经营目标指引,在保证项目顺利进展的同时,本文的研究也能为其他的管道项目经济分析提供借鉴。
[Abstract]:With the increasing demand for refined oil products in Hunan market, the transportation of oil products will restrict the sale of oil more and more seriously. At present, the supply of refined oil resources in Hunan Province needs to be transported twice by rail or road from Zhuzhou to Zhuzhou. Railway and road transportation have many problems such as high transportation cost, large loss and poor transportation during peak period. Compared with these problems, pipeline transportation has less difficulty in transportation organization. In order to optimize the logistics supply system of Hunan oil products and ensure the security of market supply, Sinopec Hunan Petroleum Company plans to further expand the network of refined oil pipeline. In this paper, Changsha-Chenzhou oil pipeline project to be built by Hunan oil company as the research object, the economic feasibility of the project is analyzed. First of all. Based on the analysis of the internal and external environment of the pipeline project, this paper analyzes the investment cost and operation cost of the project in combination with the project construction plan. Secondly, the paper discusses the allocation of oil product resources after the project is put into use, and based on this, the future income of the project is calculated, and the economic benefits of the project are analyzed. In view of the problems that may be encountered in the process of project implementation, this paper puts forward the guarantee measures to make the project carry out normally from the aspects of organization management and technical support. The research in this paper will support the economic decision of Changsha-Chenzhou refined oil pipeline project, and provide the operation goal guidance for the project to enter the operation period, at the same time to ensure the smooth progress of the project. The research in this paper can also provide reference for other pipeline project economic analysis.
【学位授予单位】:湖南大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:TE973;F426.22

【参考文献】

相关期刊论文 前10条

1 刘燕霄;黄晓君;;项目投资价值分析方法研究综述[J];财会通讯;2009年18期

2 梁凯;;论石油企业投资项目可行性研究策略[J];当代经济;2011年13期

3 姜峰;刘亮;;长输油管道的安全投资最优模型及评价分析[J];化学工程与装备;2011年01期

4 杨芳;;天然气长输管道项目环境风险评价实例分析[J];能源与环境;2012年03期

5 陈武;;企业项目投资决策方法综述——兼论四维决策框架体系[J];工业技术经济;2011年01期

6 戚爱华;;我国油气管道运输发展现状及问题分析[J];国际石油经济;2009年12期

7 杨亚达,王明虎;投资评价方法中基准贴现率的选择与分析[J];管理世界;2001年05期

8 刘彩华;范光羽;;投资项目财务评价方法的理论探究[J];中国管理信息化;2010年02期

9 孙红;;投资项目可行性研究理论综述[J];华北电力大学学报(社会科学版);2008年06期

10 王影;企业投资项目决策分析[J];黑龙江财会;2002年01期



本文编号:1400936

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/shengchanguanlilunwen/1400936.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户51cda***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com