基于WSR系统论的变电工程造价分析

发布时间:2018-02-28 03:22

  本文关键词: 变电工程造价 WSR系统论 支持向量机 模糊偏好 解释结构模型 出处:《华北电力大学》2013年硕士论文 论文类型:学位论文


【摘要】:随着我国国民经济的飞速发展,电力需求高速增长,由此推进了变电站建设的大规模兴起。为了电力工程建设项目的健康、持续、稳定发展,其投资经济性必须要得到科学的规划和控制。变电工程造价研究是实现电力工程投资效益的关键,也是关系电力相关行业未来发展路径的首要问题。 本文利用“事理”-“人理”-“物理”(WSR)系统方法论对变电工程造价的影响因素开展系统性识别,构建相应的“人理”、“事理”、以及“物理”体系,并对其进行深度解析。首先介绍我国变电工程造价目前的研究背景,以及国内外变电工程造价管理研究现状。其次详细梳理WSR系统论的内容、原则、特点、以及流程步骤,并分析利用WSR系统论研究变电工程造价的适用性。然后,运用“WSR”理论将庞杂的变电工程造价影响因素构建为“物理”、“事理”、“人理”体系。最后针对国内某地区的“十一五”变电站造价历史数据,利用数据挖掘方法对所构建的“物理”体系进行数据预处理和偏相关分析,同时运用支持向量机方法构建了变电站估算模型,并验证其预测优越性。运用模糊偏好方法对“事理”体系进行了指标评价。运用解释结构模型对“人理”体系进行指标的阶层划分,得到深层指标、浅层指标和表层指标,并对所呈现的结果进行合理解释。
[Abstract]:With the rapid development of China's national economy and the rapid growth of power demand, the large-scale rise of substation construction has been promoted. For the healthy, sustained and stable development of electric power engineering construction projects, The research on the cost of substation project is the key to realize the benefit of power engineering investment, and it is also the most important issue related to the future development path of the electric power industry. In this paper, the systematic identification of the factors affecting the cost of substation engineering is carried out by using the methodology of "principle"-"human principle"-"physics") system, and the corresponding "human principle", "principle" and "physics" system are constructed. First of all, it introduces the research background of the cost of substation engineering in China and the current research situation of cost management in China and abroad. Secondly, the contents, principles, characteristics and process steps of WSR system theory are analyzed in detail. The applicability of using WSR system theory to study the cost of substation project is analyzed. Based on the theory of "WSR", the influential factors of the cost of substation engineering are constructed as "physics", "principle" and "human science" system. Finally, according to the historical data of substation cost in a certain area in China, The data preprocessing and partial correlation analysis of the constructed "physical" system are carried out by using the data mining method. At the same time, the substation estimation model is constructed by using the support vector machine (SVM) method. The prediction superiority is verified. The index evaluation of "principle" system is carried out by using fuzzy preference method. The stratification of "human science" system is carried out by using the explanatory structure model, and the deep index, shallow index and surface index are obtained. The results presented are explained reasonably.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:F426.61

【参考文献】

相关期刊论文 前10条

1 郭婧娟;我国与发达国家工程造价管理模式的比较分析[J];北方交通大学学报(社会科学版);2003年01期

2 赵彦丽;刘秀娟;;输变电安装工程施工阶段影响工程造价的因素分析及对策[J];电力学报;2008年03期

3 周小军;漆文邦;王杨科;;模糊数学在水利水电工程投标报价中的应用[J];工程建设与设计;2006年08期

4 彭光金;俞集辉;崔荣;韦俊涛;司海涛;朱辉;;基于数据挖掘技术的输电工程造价估算[J];工业工程与管理;2009年03期

5 王真荣,陈锦桂;电力工程评标标底与评分标准数学模型研究[J];湖北电力;2001年03期

6 王佼;;500kV输电线路工程造价新评价指标体系研究[J];华东电力;2008年09期

7 刘绮;秦杰;;基于TCM理论的电力工程造价管理策略研究[J];华东电力;2010年05期

8 杨晓林,郭玉田;基于神经网络的工程估价系统研究[J];哈尔滨建筑大学学报;2002年02期

9 陈里莉;;电网建设工程的造价分析及控制措施[J];科技传播;2010年03期

10 王雪青;邴兴国;李海丽;;基于模糊偏好关系的工程项目方案优选方法研究[J];科技进步与对策;2008年10期

相关硕士学位论文 前1条

1 郭翠云;基于WEB的电力工程造价信息数据库系统的设计与实现[D];中国海洋大学;2010年



本文编号:1545542

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/shengchanguanlilunwen/1545542.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户d54c7***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com