县级供电企业工程项目风险管理研究
本文选题:县级供电企业 + 项目风险 ; 参考:《华北电力大学》2013年硕士论文
【摘要】:电力行业作为我国国民经济的支柱性产业之一,担负着我国全国国民经济发展和保障人民正常生活用电的艰巨任务。随着我国改革开放的不断深化和经济体系的不断完善,工程项目的招标、投标、风险投资机制、责任制的逐步推广,项目风险管理的实施显得尤为重要。 县级供电企业相对于其他大供电企业来说,自身在规模、技术、资金、施工经验上略差,整体的综合实力低一个层次。在经营活动的不确定性以及竞争的不断加剧的情况下,对县级供电企业工程项目的风险管理是十分必要的。 本文基于密云供电公司的实际情况,运用项目风险管理的分析方法,为更好的规避风险,将电力工程项目的特殊性充分的融入其中,结合电网和特定环境,对项目风险进行识别、量化、评价、制定应对措施、进行风险监控,从经济风险、技术风险、环境风险、社会与市场风险、管理风险角度出发,建立电力工程项目的风险评价体系,并在此基础上根据风险评价指标的特点,量身打造一套工程项目模糊综合评价模型。并以密云唐庄110千伏变电站升压工程为实例,根据该工程的工程量、施工环境、技术要求、设备要求、工期长短、所需资金额度等具体情况,运用本研究所建立的密云供电公司的风险管理模型,进行检验性分析,并根据这一结果制定密云供电公司应该采取的风险防范措施,希冀为完善密云供电公司现行制度和体系提供思考。
[Abstract]:As one of the pillar industries of our national economy, the electric power industry shoulders the arduous task of developing the national economy and ensuring the normal life of the people.With the deepening of China's reform and opening up and the continuous improvement of the economic system, it is particularly important to carry out project risk management because of the gradual promotion of project bidding, bidding, venture capital mechanism and responsibility system.Compared with other large power supply enterprises, the county-level power supply enterprises are inferior in scale, technology, capital and construction experience, and the overall comprehensive strength is one level lower.Under the circumstance of the uncertainty of operation activity and the increasing competition, it is necessary to manage the project risk of power supply enterprise at county level.In this paper, based on the actual situation of Miyun Power supply Company, using the analysis method of project risk management, in order to better avoid risk, the particularity of power engineering project is fully integrated into it, combined with the power grid and specific environment.Identifying, quantifying, evaluating, formulating countermeasures and monitoring the risks of the project, starting from the perspectives of economic risk, technical risk, environmental risk, social and market risk, and management risk,The risk evaluation system of electric power engineering project is established, and a set of fuzzy comprehensive evaluation model of engineering project is built according to the characteristics of risk evaluation index.Taking the 110 kV substation boost project of Miyun Tangzhuang as an example, according to the specific conditions of the project, such as quantity, construction environment, technical requirements, equipment requirements, duration of construction, amount of funds required, etc.,By using the risk management model of Miyun Power supply Company established by this research, the paper makes a test analysis, and according to this result, formulates the risk prevention measures that should be taken by Miyun Power supply Company.Hope to perfect Miyun power supply company's current system and system to provide reflection.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:F426.61
【参考文献】
相关期刊论文 前10条
1 林卫宇;林炳华;林济群;;电力工程项目风险管理研究[J];能源与环境;2009年04期
2 丁迎周;宋春雨;;风险管理及其在航天项目中的应用[J];装备制造技术;2008年09期
3 谢喜丽;;项目风险管理发展历程及趋势[J];合作经济与科技;2010年14期
4 朱大萌,马诗咏;项目风险管理的持续改进方法[J];建筑管理现代化;2004年04期
5 卢德林;模糊综合评判在土建工程投标风险决策中的应用[J];基建优化;1999年06期
6 尹志军,陈立文,王双正,苏春生;我国工程项目风险管理进展研究[J];基建优化;2002年04期
7 张建斌,张楠楠;我国工程风险管理与工程保险制度研究[J];基建优化;2003年02期
8 王红卫;;建设项目风险管理问题研究:美国经验及其启示[J];技术经济与管理研究;2008年05期
9 高忠民;;浅谈我国工程项目风险管理的研究及应用现状[J];科技致富向导;2011年33期
10 钱昊,马维珍;层次分析法在项目风险管理中的应用[J];兰州交通大学学报;2005年03期
相关博士学位论文 前3条
1 唐小丽;模糊网络分析法及其在大型工程项目风险评价中的应用研究[D];南京理工大学;2007年
2 官庆;大型公用建筑项目设计风险管理研究[D];西南交通大学;2007年
3 王农跃;企业全面风险管理体系构建研究[D];河北工业大学;2008年
相关硕士学位论文 前4条
1 王震;县级供电企业经营风险评估与规避策略研究[D];华北电力大学(北京);2011年
2 吴强;我国证券公司风险管理研究[D];山东大学;2007年
3 马悦;电网规划项目风险评估研究[D];华北电力大学(河北);2008年
4 赵连江;电力工程总承包风险研究与对策[D];华北电力大学(北京);2010年
,本文编号:1731403
本文链接:https://www.wllwen.com/guanlilunwen/shengchanguanlilunwen/1731403.html