基于管理有效性的DR煤矿掘进队绩效评价研究
[Abstract]:As the largest state-owned enterprise in Heilongjiang province, the abuse of extensive management mode in coal market gradually appears. This year, when the group's new team was set up, it put the strengthening of management at the top of its work, requiring all grass-roots units to run enterprises scientifically in a modern way, to implement fair and serious assessment measures, to play a performance-oriented role, and to promote enterprise reform to overcome difficulties. For this reason, the content of this paper has profound practical value. The current performance evaluation of Longmei Group is still based on the planned economy management assessment method in the 1980s. The evaluation method is too simple and one-sided, and the evaluation results of the excavation units are often affected by complex basic conditions. This results in the emphasis on measuring the performance output under the objective production conditions and neglecting the working effort of the managers in this basic environment. The evaluation results can not meet the urgent needs of current enterprise development. This paper first points out the background, purpose and significance of the topic, and then describes the performance evaluation theory related to the coal industry at home and abroad, and enumerates some domestic research achievements of the performance evaluation methods of coal enterprises. Taking Dr Coal Mine tunneling team of Longmei Group as an example, this paper briefly introduces the present situation of performance management of the team, and points out four deficiencies in the performance evaluation of this enterprise. Then the concept of management effectiveness is introduced and the performance evaluation index system of tunneling team is constructed with the help of AHP. The evaluation model of coal mining tunneling production unit based on management effectiveness is studied and constructed emphatically by using DEA evaluation model. Finally, the real data of 11 tunneling teams are used to analyze the results of the performance evaluation model. Through careful analysis and evaluation results, this performance evaluation method is aimed at eliminating the difference of objective conditions between different driving teams in coal mine. This paper evaluates and evaluates the subjective and effective efforts made by the underground tunneling production managers in coal mine enterprises to improve the production performance by using the metrological method. Therefore, it provides a realistic theoretical reference for China's coal mine enterprises to strengthen performance management.
【学位授予单位】:哈尔滨工业大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:F426.21;F272.92
【相似文献】
相关期刊论文 前10条
1 姚荣华;;这个班长为何“下岗”[J];现代班组;2011年07期
2 王耀林;;掘进队承包——劳动组织的有效形式[J];煤炭经济研究;1985年09期
3 王斌;;实施“33132”管理模式 打造安全高效掘进队[J];现代职业安全;2013年09期
4 金其兴;;用进尺考核基建单位掘进队好[J];煤炭经济研究;1984年08期
5 杨学胜;李长城;;煤炭企业开拓掘进队的投入产出承包试探[J];煤炭经济研究;1986年10期
6 杨桢X;掘进队搞活内部分配的探讨[J];煤炭经济研究;1988年12期
7 杜后强;“猛虎”井下显余威[J];当代矿工;2004年09期
8 李秋卫;;飞钻惊心[J];当代矿工;2013年09期
9 赵庆耀;;“守门”王[J];吉林劳动保护;2011年10期
10 ;不知疲倦的“老黄牛”戴树华[J];当代矿工;1994年S1期
相关重要报纸文章 前10条
1 见习记者 赵博;铁北煤矿掘进队: 黑暗中撑起光明巷道[N];中国电力报;2011年
2 本报记者 阎文华;从农民工到王牌掘进队长[N];宁夏日报;2013年
3 曹坤 实习生 刘淑娟 记者 于敬文;掘进队的“指南针”[N];鸡西日报;2007年
4 杨岩 王侠;有困难找支书[N];鸡西日报;2007年
5 王磊 杜后强;猛虎掘进队:一面不褪色的旗帜[N];中国煤炭报;2009年
6 本报记者 张富江 通讯员 高金祥 胡春来;记录踩脚下 安全握手中[N];中国煤炭报;2010年
7 本报记者 高柱 本报通讯员 罗勇 晓燕 书文;“我这一生值了!”[N];工人日报;2011年
8 李德富 记者 于敬文;东海矿掘进速度大幅提升[N];鸡西日报;2007年
9 本报记者 戚其龙;一曲“无坚不摧”的壮歌[N];中国煤炭报;2009年
10 本报记者 鲍丹;掘进先锋 乌金本色[N];人民日报;2011年
相关硕士学位论文 前1条
1 朱建国;基于管理有效性的DR煤矿掘进队绩效评价研究[D];哈尔滨工业大学;2015年
,本文编号:2151371
本文链接:https://www.wllwen.com/guanlilunwen/shengchanguanlilunwen/2151371.html