武川至察右中旗500KV送电线路路径方案决策研究
[Abstract]:With the development of economy and the sharp increase of power load in large and medium-sized cities, the demand for electricity in the market is also increasing, and the voltage level of transmission lines is also rising. The power supply level of 220kv power grid has been unable to meet the needs of development. 500kv high voltage power grid engineering has become the inevitable trend of power grid construction, and the transmission line is an important part of power grid construction, which undertakes the important task of transmitting and distributing electric energy. The quality of transmission line will have a direct impact on the safe operation of transmission line, the quality of transmission power and the overall cost of the project. Therefore, the choice of 500kv transmission line path scheme is an important link in line engineering design. Making scientific and reasonable decisions on transmission line path scheme not only plays a guiding role in the further design of transmission line engineering. It is also of great significance to the regional power demand and the long-term planning of the power grid. Based on the present situation of the development of transmission line engineering and the research status of transmission line path scheme decision, this paper takes the 500KV transmission line project from Wuchuan to Chayou Zhongqi as the research object. On the basis of expounding the principles and steps of the transmission line path scheme decision, this paper introduces the present situation and overall planning of the power system of the 500KV transmission line project from Wuchuan to Chayou Zhongqi. According to the characteristics of 500KV transmission line project from Wuchuan to Chayou Zhongqi, this paper makes a qualitative and quantitative analysis of the factors that affect the decision of the line path scheme of the project, and sums up the main influencing factors. Therefore, the evaluation index system of 500KV transmission line path scheme decision from Wuchuan to Chayou Zhongqi is constructed, and the comprehensive evaluation method combining analytic hierarchy process (AHP) and TOPSIS method is applied to the transmission line path scheme decision. The decision model of 500KV transmission line path scheme from Wuchuan to Chayou Zhongqi is constructed, the alternative line path scheme is optimized, the optimal path scheme is obtained, and the rationality of the selected scheme is analyzed. The research content of this paper provides a reference for route decision-making of transmission line.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:F426.61
【参考文献】
相关期刊论文 前10条
1 张晓东,许邦鑫,黎景良;利用卫星遥感技术进行电力线路设计[J];测绘通报;2005年07期
2 周学文;;“3S”技术在电力线路工程勘测设计中应用的探讨[J];电力技术经济;2009年01期
3 常增亮;;利用DOM及DEM数据进行输电工程勘测设计研究[J];能源技术经济;2010年12期
4 陈海波,陈富生;采空区架空送电线路塔基稳定性评价[J];电力勘测;2000年01期
5 燕福龙;地理信息系统(GIS)在线路专业的应用[J];山西电力;2004年06期
6 党耀国,刘思峰,刘斌,陶勇;基于动态多指标灰色关联决策模型的研究[J];中国工程科学;2005年02期
7 陈和平;3S在线路勘测中的应用[J];湖南地质;2003年01期
8 朱义中;陈雄波;;基于GIS的输电线路决策支持系统优选路径[J];四川理工学院学报(自然科学版);2008年01期
9 常增亮;杜祖伦;;利用山东省第二次土地调查数据进行送电工程勘测设计[J];山东国土资源;2010年11期
10 张文红,陈森发;农业生态环境灰色综合评价及其支持系统[J];系统工程理论与实践;2003年11期
相关博士学位论文 前1条
1 施慧;“两型电网”发展建设评价体系及应用研究[D];华北电力大学(北京);2011年
相关硕士学位论文 前4条
1 刘洋;RS和GIS技术在输电线路优选中的应用[D];成都理工大学;2011年
2 蓝健均;送电线路工程项目安全管理研究[D];华北电力大学(北京);2008年
3 赵丹阳;兴隆庄220千伏变电站工程项目后评价研究[D];华北电力大学(河北);2010年
4 董长青;华能杨电扩建热电联产机组项目技术经济问题研究[D];华北电力大学(河北);2010年
本文编号:2474036
本文链接:https://www.wllwen.com/guanlilunwen/shengchanguanlilunwen/2474036.html