当前位置:主页 > 管理论文 > 财税论文 >

财政投资项目工程变更存在的问题及建议

发布时间:2019-05-20 09:53
【摘要】:工程项目建设周期长,受自然条件和客观因素影响大,实际施工情况与设计会发生变化,在施工过程中工程变更在所难免。工程变更会对建设项目的工期、质量、特别是投资控制产生影响,对此问题认识不足,容易形成监管漏洞,造成投资超支、浪费财政资金的现象,同时也成为某些承包商弄虚作假、非法牟利的手段。笔者结合工作实际,阐述了财政投资项目工程变更存在的问题,并提出相关改进建议。
[Abstract]:The construction cycle of the project is long, which is greatly affected by the natural conditions and objective factors. The actual construction situation and design will change, and the engineering change is inevitable in the construction process. The change of project will have an impact on the duration and quality of the construction project, especially on the investment control. There is a lack of understanding of this problem, and it is easy to form a regulatory loophole, resulting in investment overexpenditure and waste of financial funds. At the same time, it has also become a means for some contractors to cheat and make profits illegally. Combined with the actual work, the author expounds the problems existing in the engineering change of the financial investment project, and puts forward some suggestions for improvement.
【作者单位】: 柳州市财务总监管理中心;
【分类号】:TU723;F812.45

【相似文献】

相关期刊论文 前10条

1 李彦新;工程变更及其管理[J];河北建筑科技学院学报;2002年02期

2 余宜林;浅析高速公路建设的变更原因及对策[J];基建优化;2001年02期

3 祁昌旺;;浅论工程变更[J];北方交通;2007年09期

4 王春玲,朱宏伟;谈工程变更程序与管理[J];森林工程;2003年04期

5 胡顺宇;;浅析高速公路工程变更的原因及影响[J];科技资讯;2008年19期

6 郭林深;论工程变更的实施和操作[J];山西建筑;2003年09期

7 韩笑;;公路工程变更探讨[J];山西建筑;2007年04期

8 刘桂兰;赵复笑;孙波;;公路工程变更管理初探[J];北方交通;2008年04期

9 古莉;;浅谈工程变更的事前控制[J];四川建材;2006年06期

10 马力;;浅谈工程变更[J];中国水运(理论版);2006年03期

相关会议论文 前1条

1 张久德;骆祥伟;;浅议工程变更[A];土木建筑学术文库(第7卷)[C];2007年



本文编号:2481567

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/shuishoucaizhenglunwen/2481567.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户c9887***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com