当前位置:主页 > 管理论文 > 营销论文 >

G供电企业电费回收风险管理与控制

发布时间:2018-01-16 09:09

  本文关键词:G供电企业电费回收风险管理与控制 出处:《华北电力大学》2015年硕士论文 论文类型:学位论文


  更多相关文章: 电费回收 风险控制 风险管理 评价模型


【摘要】:电力体制改革是中国经济社会发展的必然要求,所以电力行业引入市场机制可以有效地进行电力资源优化,提高电力资源生产和传输的效率。然而,电力市场中,电网企业直接或间接地存在经营风险,电力营销工作的难度越来越大。如今电费回收风险已经成为电力公司主要关心和把控的经营风险。本文结合目前G市电费回收现状和管理措施,分析电费回收风险的成因和问题,通过对产生电费回收风险的相关因素进行分析、鉴别寻找各因素间内在、本质和必然的联系及其特定规律,以确定各因素对电力企业的影响,并建立G市电费回收风险指标体系;选定在技术上具有先进性、在理论上具有合理性、在操作上具有可靠性的AHP方法对建立的电费回收风险指标体系进行权重设计;在此基础上,通过FAHP模糊综合评价模型对G市电费回收指标体系进行评估管理,找出电费回收风险较大的主要企业;根据评价的结果建立动态的,符合G市实际的电费回收控制体系,将评价不好的企业进行重点把控。通过科学的建立G市电费回收指标体系和评价体系,实现G市电费回收控制的目的,对其他地市公司电费回收工作的开展起到指导作用。
[Abstract]:The reform of electric power system is an inevitable requirement of China's economic and social development, so the introduction of market mechanism in power industry can effectively optimize power resources and improve the efficiency of power resources production and transmission. In the electric power market, there are direct or indirect operating risks in power grid enterprises. Electricity marketing work is becoming more and more difficult. Nowadays, the risk of electricity recovery has become the main concern and control of the operation risk of power companies. This paper combined with the current situation of electricity recovery and management measures in G City. Analyze the causes and problems of the risk of electricity recovery, through the analysis of the related factors to generate the risk of electricity recovery, identify and find the inherent, essential and inevitable relationship between the factors and their specific laws. In order to determine the impact of various factors on power enterprises, and establish G City electricity recovery risk index system; The AHP method, which is advanced in technology, reasonable in theory and reliable in operation, is chosen to design the weight of the risk index system of electricity recovery. On this basis, through the FAHP fuzzy comprehensive evaluation model to the G city electricity recovery index system evaluation management, find out the major enterprises with higher risk of electricity recovery; According to the results of the evaluation to establish a dynamic, in line with the actual G City electricity recovery control system, the evaluation of enterprises to focus on the control, through the scientific establishment of G City electricity recovery index system and evaluation system. To realize the purpose of electricity recovery control in G city, play a guiding role in the development of electricity recovery work of other prefectural companies.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:F426.61

【参考文献】

相关期刊论文 前1条

1 吴金艳;陈进;;构建我国能源政策体系的思考[J];创新;2009年06期



本文编号:1432435

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/yingxiaoguanlilunwen/1432435.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户8ec9c***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com