新安江水库移民档案

发布时间:2018-07-16 23:17
【摘要】:正新安江水电站建是建国后中国自行设计、自制设备、自主建设的第一座大型水力发电站。1956年6月新安江水电站建设列入国家第一个五年计划,1957年8月大坝工程动工,1959年9月新安江实现截流,水库开始蓄水,1960年4月第一台水轮发电机组投产发电。1954年8月,浙江省成立新安江移民安置委员会,1956年11月首批移民迁桐庐,从1956年至1970年的15年间,淳安县共移民近29万人。淳安县档案馆所藏"新安江水库移民档案",基本
[Abstract]:After the founding of the people's Republic of China, the construction of Zhenganjiang Hydropower Station was a self-designed and self-made equipment. The construction of Xinanjiang Hydropower Station in June 1956 was included in the first five-year plan of the country, the dam project began in August 1957, and in September 1959 the Xinanjiang River was cut off. The reservoir began to store water, and the first hydroelectric generator set up for power generation in April 1960. In August 1954, Zhejiang Province established the Xin'anjiang Resettlement and Resettlement Committee. In November 1956, the first batch of emigrants moved to Tonglu. During the 15 years from 1956 to 1970, there were nearly 290000 immigrants in Chun'an County. "Resettlement Archives of Xinanjiang Reservoir", collected by Chun'an County Archives, basic
【分类号】:D632.4

【相似文献】

相关期刊论文 前1条

1 刘炎迅;;新安江移民“大跃进”[J];中国新闻周刊;2010年20期

相关会议论文 前3条

1 刘洪韬;严中伟;戴新刚;黄刚;;20世纪新安江水库4次泄洪与极端降水事件的环流背景场[A];中国气象学会2008年年会极端天气气候事件与应急气象服务分会场论文集[C];2008年

2 刘洪韬;严中伟;戴新刚;黄刚;;二十世纪新安江水库四次泄洪极端降水与环流背景分析[A];中国气象学会2007年年会气候变化分会场论文集[C];2007年

3 陈侣白;;新安江水库千岛湖[A];福建省诗词学会2007年年会论文集暨福建诗词(第十七集)[C];2007年

相关重要报纸文章 前7条

1 本报记者 杨丽 通讯员 徐小晟 邹楚环;新安江水库移民踏上致富路[N];浙江日报;2011年

2 早报记者 葛熔金;华东最大水库12年来首次泄洪[N];东方早报;2011年

3 记者 潘一峰 通讯员 李朝秀;新安江水库将于今日上午泄洪[N];杭州日报;2011年

4 本报记者 樊国安;童禅福:20年心血终写就“迟到50年的报告”[N];中国新闻出版报;2009年

5 童禅福;省委书记的“万言书”[N];中华读书报;2009年

6 记者 黄深钢;调峰驭水在人为[N];新华每日电讯;2011年

7 记者 施晓义 通讯员 谢根能;浙江打响防汛大决战[N];浙江日报;2011年



本文编号:2128002

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/zhengwuguanli/2128002.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户c40c7***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com