水利工程PPP项目合同柔性调节机制研究
发布时间:2018-01-25 09:11
本文关键词: 水利工程PPP项目 合同再谈判 风险传递 合同柔性 柔性调节机制 出处:《水电能源科学》2017年11期 论文类型:期刊论文
【摘要】:PPP项目实施过程中,政府和社会资本就未约定风险责任的风险事件或非预期风险事件的责任分担进行再谈判是不可避免的。在细化项目运作流程的基础上,结合水利工程PPP项目的专业特点,分析了水利工程PPP项目的合同柔性,构建了水利工程PPP项目合同9种柔性调节机制,对合同结构不完备和外部环境影响造成的风险进行再分担,确保PPP项目的顺利实施。研究成果可为水利工程PPP项目合同执行提供理论参考。
[Abstract]:In the process of PPP project implementation, it is inevitable for the government and social capital to renegotiate the responsibility sharing of the risk event or the unexpected risk event, which is not stipulated in the risk responsibility, and on the basis of the refinement of the project operation process. Combined with the specialty characteristics of PPP project of water conservancy project, the contractual flexibility of PPP project of water conservancy project is analyzed, and nine flexible adjustment mechanisms of PPP project contract of water conservancy project are constructed. The risk caused by incomplete contract structure and external environment is reshared to ensure the smooth implementation of PPP project. The research results can provide a theoretical reference for the implementation of PPP project contract in water conservancy project.
【作者单位】: 华北水利水电大学水利学院;华北水利水电大学管理与经济学院;
【基金】:国家自然科学基金项目(51709116) 华北水利水电大学博士研究生创新基金项目(2014120108) 2016年度河南省软科学研究计划项目 河南省高等学校重点科研项目计划(17B570003)
【分类号】:F283;F426.91
【正文快照】: 1引言PPP项目实施过程中,当未约定风险责任的风险事件或非预期风险事件发生时,政府和社会资本需通过协商确定该类风险事件的责任分担,这就涉及到在原有PPP项目合同基础上进行合同再谈判。目前,关于PPP项目再谈判的研究较多,如De Brux Julie[1]指出特许经营合同再谈判可帮助公