基于BPR理论的工程造价咨询企业业务流程重组研究
[Abstract]:BPR theory is the product of enterprise management reform. At present, the traditional business of cost consulting enterprises has many disadvantages, which can not keep up with the needs of the development of cost consulting market, so it needs to transition to the whole process of engineering cost consulting business. In this paper, the BPR management theory, which is popular in the 1990s, is introduced into the engineering cost consulting industry. From the point of view of the engineering cost consulting enterprise, the whole process engineering cost consulting business is regarded as a project carried out by the enterprise, and the whole process engineering cost consulting business is considered as a project, which is combined with the BPR theory. From the aspects of work content, scope, process and other aspects of in-depth research, comprehensive analysis, and the whole process of engineering cost consulting business stages of process reengineering. Firstly, it introduces the development history of cost consulting enterprise and BPR theory, and then introduces the whole process engineering cost management and BPR theory of cost consulting enterprise. Thirdly, it analyzes the necessity and feasibility of cost consulting enterprise's business process reengineering, and then constructs the process of cost consulting enterprise's whole process engineering cost business based on BPR theory. Then the BIM technology is applied to the construction of information environment which can support the construction of the whole process cost consulting business process reengineering to promote the development of the business process reengineering. This paper has a good guiding effect on the transformation and upgrading of engineering cost consulting enterprises.
【学位授予单位】:西华大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:F282;F271
【参考文献】
相关期刊论文 前10条
1 黄小国;;探析全过程造价咨询[J];中国新技术新产品;2011年10期
2 薛瑞;;工程造价咨询企业在发展中面临的问题及对策[J];建筑监督检测与造价;2010年05期
3 孔祥坤;寇准;;全生命周期造价管理与全过程造价管理比较[J];合作经济与科技;2010年03期
4 杨晓冬;李白;;黑龙江省工程咨询业SWOT分析与发展趋势研究[J];建筑管理现代化;2009年04期
5 殷小玲;;对宁夏工程造价咨询企业服务创新的几点思考[J];宁夏党校学报;2009年04期
6 蔡天雪;戴世明;殷友根;;工程造价全过程管理重点和对策[J];建筑管理现代化;2007年06期
7 郭忠金;李非;;业务流程再造理论的起源、演进及发展趋势[J];现代管理科学;2007年11期
8 陈玉恒;;我国工程咨询业结构调整的战略与路径选择[J];中国工程咨询;2007年07期
9 唐祥忠;邓锋;;全过程造价咨询业务难点解析[J];建筑经济;2006年S2期
10 马亭;许强;;工程咨询业服务战略发展分析[J];中国工程咨询;2006年10期
相关硕士学位论文 前10条
1 王少星;基于BIM技术的工程项目信息管理研究[D];北方工业大学;2016年
2 何杪耘;工程造价咨询企业全过程造价管理的成熟度研究[D];重庆大学;2015年
3 刘畅;基于BIM的建设工程全过程造价管理研究[D];重庆大学;2014年
4 赵辰;中小型工程造价咨询企业业务流程再造的研究[D];山东建筑大学;2014年
5 余霞;全过程造价咨询业务的风险点识别研究[D];重庆大学;2013年
6 刘媛媛;全过程造价咨询业务研究[D];天津理工大学;2012年
7 陈飞;Y公司流程再造研究[D];山东大学;2010年
8 王超;工程造价咨询公司进行全过程造价咨询业务研究[D];天津理工大学;2008年
9 史丹丹;建设项目全过程造价咨询服务体系的构建及评价[D];武汉理工大学;2004年
10 王建辉;BPR及其在房地产企业中的应用研究[D];重庆大学;2001年
,本文编号:2426546
本文链接:https://www.wllwen.com/jingjifazhanlunwen/2426546.html