宁夏华夏电源有限公司蓄电池装配生产线改善研究
[Abstract]:Extensive production process management, unbalanced production capacity and low utilization ratio of personnel and equipment are the practical problems faced by enterprise production management at present. How to systematically study the influence factors of low production capacity in the production process, and analyze the bottleneck link in depth, and take measures to improve the bottleneck capacity is the problem that enterprises must solve. In recent years, with the application and popularization of industrial engineering technology, it has gradually reflected its important role in solving the above problems. The research object of this paper is Ningxia Huaxia Power supply Co., Ltd., the overall capacity of the company can not meet the requirements of the order, the production capacity of each process is uneven, especially the assembly capacity has been restricting the company's capacity increase. Low utilization of production process operators and equipment. In view of this problem, this paper studies the main causes of the productivity problem by using the relevant theories and methods of industrial engineering, and puts forward the improvement scheme, which has achieved better results. The main contents of this paper are as follows: (1) firstly, the short plate that restricts the production capacity of the company is determined by the actual situation of each process capacity, and the assembly line of 2# is determined as the main problem point. (2) aiming at the assembly line of 2#, Time research method is used to determine the working time, to calculate the balance rate of production line, and to determine the problem position. The whole assembly process is analyzed by the process program method, the existing problems are summarized by the 5W1H method, the problems existing in the bottleneck station are analyzed by using the joint operation analysis. (3) on the basis of the process program analysis and the joint operation analysis, By using ECRSI principle, the phenomena of low man-machine utilization ratio and unbalanced workload in the product line No. 2# are improved. By improving the utilization ratio of operators and production equipment to achieve the goal of improving assembly line capacity. (4) to solve the problem of working environment on the production site, the raw materials of production equipment are placed. Improve the safety of production area. (5) evaluate the effect of the improvement. After the implementation of the improved scheme, the man-machine utilization ratio of the production line of lead-acid battery assembly and assembly area has been obviously improved, the production capacity has been greatly increased, the production cost has been reduced, and the production cycle of the product has been significantly shortened. The working environment of the operators has been greatly improved.
【学位授予单位】:东北大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:F426.6;F273
【相似文献】
相关期刊论文 前10条
1 ;成都皮克电源有限公司[J];电焊机;2004年S1期
2 ;合肥阳光电源有限公司招聘信息[J];电工技术杂志;2004年11期
3 ;正弦波逆变电源[J];电源世界;2001年06期
4 海洋;用理智的抉择迎接入世后的挑战——访朝阳电源有限公司董事长王刚先生[J];电子产品世界;2001年21期
5 ;中山市发思特电源有限公司[J];广东科技;2003年12期
6 ;不断创新、追求品质、持续改进、更好服务 新时代的跨越!——记发展中的“合肥阳光电源有限公司”[J];电源技术应用;2004年04期
7 ;合肥阳光电源有限公司诚聘[J];电源技术应用;2005年05期
8 蔡敦权;;优秀的团队是企业无往不胜的源泉 ——访浙江超威电源有限公司总经理周明明[J];中国自行车;2006年03期
9 ;南京鹏图电源有限公司[J];电源技术应用;2008年07期
10 ;超威电源有限公司新产品通过专家鉴定[J];蓄电池;2010年01期
相关重要报纸文章 前10条
1 范高明;做好做实丰富内涵 真诚厚德求实发展[N];中国高新技术产业导报;2008年
2 记者 刘纯友;11家企业违法排污被重罚[N];安徽日报;2009年
3 陆向军;金巢开发区一投资1.42亿元项目投产[N];抚州日报;2009年
4 陈丹华;我市6家企业因存在环境问题被亮信贷“红牌”[N];安庆日报;2010年
5 记者 李树军;加快推进建设步伐确保企业更好发展[N];朝阳日报;2012年
6 本报记者 徐志蔚;航天长峰朝阳电源有限公司揭牌[N];朝阳日报;2007年
7 余凯;隆源双登 转换主业意已决[N];中国证券报;2003年
8 记者 吕丽华;要通过搬迁改造实现企业尽早上市目标[N];朝阳日报;2013年
9 苏虹邋本报记者 胡涛;一投资亿元项目落户金巢[N];抚州日报;2008年
10 张振峰 薛章;为企业插上科技翅膀[N];朝阳日报;2009年
相关硕士学位论文 前1条
1 王,
本文编号:2280333
本文链接:https://www.wllwen.com/jingjilunwen/gongyejingjilunwen/2280333.html