工程项目施工阶段成本控制要素及其关系研究
发布时间:2017-12-31 10:46
本文关键词:工程项目施工阶段成本控制要素及其关系研究 出处:《经贸实践》2016年02期 论文类型:期刊论文
更多相关文章: 工程项目 成本控制要素 主成分分析 相对重要性指数
【摘要】:以工程项目施工阶段成本控制要素为研究对象,通过文献研究初步识别出30个成本控制的基本要素并进行问卷调查;然后运用相对重要性指数分析要素之间的相对关系,并对排名靠后的要素进行分析;最后,运用主成分分析法探索要素的内部关系,提取7个主成分因子进行解释和命名,分别是:动态监控、计划水平、控制尺度、沟通协作、资源控制、控制手段和成本分析。
[Abstract]:Taking the cost control elements of the construction stage of the project as the research object, 30 basic elements of the cost control were identified through the literature research and questionnaire survey was carried out. Then the relative relationship between the elements is analyzed by using the relative importance index, and the factors at the bottom of the ranking are analyzed. Finally, the principal component analysis is used to explore the internal relationship of the elements, and seven principal component factors are extracted for interpretation and naming, namely: dynamic monitoring, planning level, control scale, communication and cooperation, resource control. Control means and cost analysis.
【作者单位】: 国华(江苏)风电有限公司;
【分类号】:TU723.3
【正文快照】: 一、引言随着我国经济的快速增长,经济的发展方式呈现多元化。虽然我国建筑业总产值在保持高速增长但是平均产值利润却在3.5%左右。相比较其它行业,建筑业的生产效率很低,所以生产利润不尽人意。究其根本原因为大多数建筑企业以目标利润为导向,以事后核算为重点,孤立强调成本,
本文编号:1359451
本文链接:https://www.wllwen.com/jingjilunwen/jianzhujingjilunwen/1359451.html