南宁江南万达广场总包交钥匙设计管控技术
发布时间:2018-01-11 08:24
本文关键词:南宁江南万达广场总包交钥匙设计管控技术 出处:《施工技术》2016年S2期 论文类型:期刊论文
【摘要】:万达总包交钥匙模式属于边设计、边报审、边施工、边优化,图纸变化多且频繁,为了协调解决设计文件存在的"错、漏、碰、缺"等问题,以南宁江南万达广场现场施工管理为实例,在设计协调管控、设计深化管控、图纸收发管理等方面进行了研究,严格施工过程,保证了工程质量,缩短建设工期,降低投资成本,为类似工程提供了新思路和新模式。
[Abstract]:Wanda total turnkey mode belongs to the design, reporting, construction, optimization, drawings change more and more frequently, in order to solve the design document problems such as "wrong, leak, touch, lack" and so on. Taking the site construction management of Wanda Square in the south of the Yangtze River in Nanning as an example, this paper studies the design coordination control, design deepening control, drawing receiving and sending management and so on. The construction process is strict and the engineering quality is guaranteed. Shortening the construction period and reducing the investment cost provide new ideas and new models for similar projects.
【作者单位】: 安徽理工大学土木建筑学院;中国建筑第四工程局有限公司;
【分类号】:TU201
【正文快照】: 1工程概况南宁江南万达广场项目位于南宁市江南区,总建筑面积80万m2,划分为A区大商业,B、C区住宅,是集购物、餐饮、娱乐、办公、住宅为一体的大型综合性公共建筑,如图1所示,根据万达总承包交钥匙工程图纸版本变化快、设计变更频繁、涉及专业工种多的特点,总包专门成立设计组加
【相似文献】
相关期刊论文 前4条
1 张宋;;浅谈轨道交通总体总包管理中的计划管理[J];广东建材;2007年05期
2 武旭华;;财政投资评审过程中的一些造价案例分析[J];山西建筑;2011年36期
3 齐有富;;试论项目经理在总包项目中的协调管理[J];科技创新导报;2007年34期
4 ;[J];;年期
相关硕士学位论文 前2条
1 王春亮;X项目总包技术及质量管理研究[D];中国科学院大学(工程管理与信息技术学院);2014年
2 李兰励;PSA所变压吸附总包项目的进度与成本管理研究[D];电子科技大学;2011年
,本文编号:1408827
本文链接:https://www.wllwen.com/jingjilunwen/jianzhujingjilunwen/1408827.html