在建高层建筑局部拆除技术及安全控制
发布时间:2018-03-13 04:21
本文选题:在建房屋 切入点:局部拆除 出处:《建筑技术》2016年11期 论文类型:期刊论文
【摘要】:某办公楼地上18层,地下1层,总建筑面积20228.87m~2,局部拆除工程作业高度大、环境复杂,下部非拆除区域成品保护难度大。确定平面及竖向拆除顺序,介绍主要构件的拆除方法,拆除方案考虑了拆除特点、周边环境、现有设备情况及工期等因素,达到安全、经济、快速的施工目标。
[Abstract]:A certain office building has 18 floors on the ground and 1 floor below the ground, with a total building area of 2028.87 mm2. The local demolition works are high, the environment is complex, and the protection of finished products in the lower part of the non-demolition area is difficult. The order of plane and vertical demolition is determined, and the demolition methods of the main components are introduced. The demolition scheme takes into account the characteristics of demolition, the surrounding environment, the existing equipment and the duration of the project, so as to achieve the goal of safe, economical and rapid construction.
【作者单位】: 连云港职业技术学院;
【基金】:江苏省建设系统科技项目(2015ZD37) 住房和城乡建设部科技计划项目(2015-K3-023) 江苏省“六大人才高峰”高层次人才资助项目(2014-JZ-016) 江苏省高职院校青年教师企业实践培训资助项目(2016QYSJ027)
【分类号】:TU746.5
,
本文编号:1604792
本文链接:https://www.wllwen.com/jingjilunwen/jianzhujingjilunwen/1604792.html