长短桩复合地基在某工程中的应用
发布时间:2018-03-26 18:25
本文选题:原建筑 切入点:新建筑 出处:《建筑结构》2016年S1期
【摘要】:该工程位于河南省郑州市中牟县,总建筑面积约11万m~2。因原场地开发已按照原建筑的结构设计完成了预应力管桩的施工,新建建筑根据施工现场、场地地质情况和设计要求等,选择采用长桩与短桩相结合的方法对地基进行处理。通过本工程的设计和施工实践,验证了长短桩复合地基设计方案的合理性。
[Abstract]:The project is located in Zhongmou County, Zhengzhou City, Henan Province, with a total building area of about 110000 mm2. Since the original site development has completed the construction of the prestressed pipe pile according to the structure design of the original building, the new building has been built according to the construction site, the geological conditions of the site and the design requirements, etc. The method of combining long pile with short pile is chosen to deal with the foundation. The rationality of the design scheme of long and short pile composite foundation is verified by the design and construction practice of this project.