装配整体式剪力墙结构预制率计算探讨
发布时间:2018-04-16 02:04
本文选题:预制装配率 + 预制混凝土构件 ; 参考:《建筑结构》2016年S1期
【摘要】:结合装配式建筑的特点及各地政策、规范和推进发展意见,就剪力墙体系下的预制率计算及构件选取进行探讨。依据各地政策、法规及惯常做法,探讨了预制构件在项目中的拆分及选择,并根据各地的预制率的计算规则,比较各构件预制率占比及各设计阶段的表达方式。同时,以某设计项目为例,再次探讨了预制率在装配整体式剪力墙结构中的考虑及应用。
[Abstract]:Based on the characteristics of prefabricated buildings and local policies, the prefabrication rate calculation and component selection under shear wall system are discussed.According to local policies, regulations and common practices, this paper discusses the separation and selection of prefabricated components in the project, and compares the prefabricated ratio of each component and the expression of each design stage according to the calculation rules of prefabrication rate in different places.At the same time, taking a design project as an example, the consideration and application of prefabrication rate in assembling integral shear wall structure are discussed again.
【作者单位】: 中船第九设计研究院工程有限公司;
【分类号】:TU756
,
本文编号:1756795
本文链接:https://www.wllwen.com/jingjilunwen/jianzhujingjilunwen/1756795.html