当前位置:主页 > 经济论文 > 建筑经济论文 >

浦项中心结构设计

发布时间:2018-04-23 09:14

  本文选题:混合结构 + 长悬臂结构 ; 参考:《建筑结构》2016年S1期


【摘要】:本工程为大底盘上的多塔结构,地上建筑包括A、B塔楼、礼堂、大厅单体。设计中在塔楼竖向构件内根据需求合理布置型钢,以满足结构受力要求,降低工程总造价。礼堂设计中采取多种措施解决平面及竖向不规则问题,设置钢结构悬挑桁架及边桁架实现无柱空间长悬挑。
[Abstract]:The project is a multi-tower structure on a large chassis, the above-ground buildings include Aton B tower, auditorium, hall monomer. In order to meet the stress requirement of the structure and reduce the total cost of the project, the steel sections are arranged reasonably in the vertical members of the tower building according to the demand in the design. In the design of auditorium, many measures are taken to solve the problem of plane and vertical irregularity, and steel structure cantilever truss and side truss are set to realize the long cantilever without column space.
【作者单位】: 中国建筑设计院有限公司;浦项建设(中国)有限公司;
【分类号】:TU973.3


本文编号:1791332

资料下载
论文发表

本文链接:https://www.wllwen.com/jingjilunwen/jianzhujingjilunwen/1791332.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户8a245***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com