复杂地质条件下桩基施工关键技术研究
本文选题:钻孔灌注桩 + 溶洞 ; 参考:《武汉工程大学》2015年硕士论文
【摘要】:随着我国城市化进程的逐年加快,车辆大幅度增加,城市道路中普通平交路口的通行方式已经不满足现代社会的发展需求,立体高架桥越来越多的出现在我国城市中。然而,由于各个城市的地理位置不同,所处的地质条件也千差万别。在已有的城市高架桥实施过程中,经常会遇到各种复杂的地质条件,使得高架桥的施工往往面临着很多难题,溶洞便是其中最为复杂的一种。本文通过实践与研究,总结出了一套成形的复杂地质条件(溶洞)下城市高架桥的施工关键技术,为后续的城市高架桥施工建设提供了有益的参考。由于岩溶的地貌特征破坏了工程地质条件的连续性,使得岩溶地层钻孔灌注桩的施工尤其困难。在通常的情况下,岩溶地层中的溶蚀、沟槽或溶洞,大多是呈水平方向发育的,它们的规模大小不同,形态各异,并且其断面的走势高低不同,宽窄不一,且多支洞;当岩溶发育完善时,钻孔灌注桩的施工是最难以掌控的。文章针对不同类型溶洞,一方面,采取抛填黏土或片石、止水帷幕或分层预注浆、钢护筒跟进等不同的技术处理措施,可以有效地解决岩溶地质条件下钻孔过程中易塌孔的难题,从而提高桩基的一次成孔率,节约成本,确保桩基施工质量;另一方面,传统的破桩头施工工艺需在混凝土强度达到70%方可施工。本文推荐的整体提升破桩头施工方法,即不需要等待桩身混凝土强度达到70%,在早期便将桩头切除,这种技术本身对桩身的完整性并没有影响,而且能减少施工时间,缩短工期。由于我国国土面积较大,各地区的地质条件不一样,因而各地方施工存在着各自不同的问题,尚无法形成一套全国通用的复杂条件下城市高架桥的施工关键技术,对其他复杂地质条件下的桩基施工,仍需继续探索和研究。
[Abstract]:With the acceleration of urbanization in our country, the number of vehicles increases greatly. The traffic mode of the ordinary intersection in urban roads has not met the development needs of modern society, and more stereoscopic viaducts appear in the cities of our country. However, due to the geographical location of different cities, the geological conditions vary widely. During the implementation of the existing urban viaduct, various complicated geological conditions are often encountered, which make the construction of viaduct often face many difficulties, among which the karst cave is the most complex one. Through practice and research, this paper summarizes a set of key techniques for urban viaduct construction under complex geological conditions (caverns), which provides a useful reference for the subsequent construction of urban viaducts. Because the geomorphological features of karst destroy the continuity of engineering geological conditions, it is particularly difficult to construct bored piles in karst strata. In general, the dissolution, trench or cave in karst strata is developed in horizontal direction, their size and shape are different, and the trend of cross section is different, width and narrow, and many holes; When karst is well developed, the construction of bored pile is the most difficult to control. For different types of caverns, on the one hand, different technical treatment measures are taken, such as throwing clay or flake stone, sealing curtain or stratified pre-grouting, following up with steel tube, etc. It can effectively solve the difficult problem of easily collapsing holes in the process of drilling under karst geological conditions, thus increasing the primary porosity of pile foundation, saving cost and ensuring the construction quality of pile foundation, on the other hand, The traditional construction technology of broken pile head needs to reach 70% concrete strength before construction. The construction method of integral lifting broken pile head recommended in this paper is that the pile head is cut off at the early stage without waiting for the concrete strength of pile body to reach 70. This technique itself has no effect on the integrity of pile body and can reduce the construction time and shorten the construction period. Due to the large area of our country and the different geological conditions in different regions, there are different problems in the construction of each place, so it is not possible to form a set of key techniques for the construction of urban viaducts under the complex conditions commonly used in the whole country. It is necessary to continue to explore and study the pile foundation construction under other complicated geological conditions.
【学位授予单位】:武汉工程大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TU753.3
【相似文献】
相关期刊论文 前10条
1 王雅荣;张国梁;;三江平原区域地理地质条件变化、问题及建议[J];黑龙江水利科技;2006年05期
2 张之梁;;不可预见地质条件索赔问题探讨[J];山西水利科技;2013年03期
3 宋会杰;王彩玲;;复杂地质条件下管线工程施工技术[J];水科学与工程技术;2006年03期
4 李卫兵;刘斌;;影响TBM选型的地质因素分析[J];水力发电;2009年08期
5 周志国;潜孔钻在复杂地质条件下穿孔技术[J];四川水泥;2005年03期
6 王应全;;地质条件对于水利工程的影响分析[J];河南水利与南水北调;2012年10期
7 徐伟伟;;地质条件对于水利工程的影响分析[J];商品混凝土;2012年09期
8 时显红;杨辉;周斌;;复杂地质条件下地质超前预报的应用[J];水力发电;2013年03期
9 高文华,杨林德;淮北临涣井田综采地质条件评价与预测[J];应用基础与工程科学学报;1998年04期
10 张仲先,赵春华,张杰;预应力高强混凝土管桩在复杂地质条件下的应用研究[J];铁道工程学报;2005年03期
相关会议论文 前10条
1 ;复杂地质条件高进高效技术研究[A];河北省煤炭工业科学技术工作会议论文集[C];2006年
2 时显红;董健;周斌;;复杂地质条件下地质超前预报应用与探讨[A];中国水力发电工程学会地质及勘探专业委员会中国水利电力物探科技信息网2012年学术年会论文集[C];2012年
3 王社荣;张智敏;;复杂地质条件对安全生产的制约及对策[A];煤矿水害防治技术研究——陕西省煤炭学会学术年会论文集(2013)[C];2013年
4 王洪;;复杂地质条件下不正常爆破的预防及处理[A];湖北省爆破学会第六届学术会议论文集[C];2001年
5 李立新;位玉红;李建伟;郭计;;复杂地质条件下煤矸分运系统的设计与应用[A];矿山建设工程新进展——2007全国矿山建设学术会议文集[C];2007年
6 曹旭;;千米深井复杂地质条件下坑透技术的应用局限性[A];全国煤矿千米深井开采技术[C];2013年
7 孙忠朴;李君阁;;苍山铁矿地质条件分类刍议[A];第八届全国采矿学术会议论文集[C];2009年
8 叶虔;刘镇;;复杂地质条件下基坑开挖与回填工程的数值模拟研究[A];第九届全国岩土力学数值分析与解析方法讨论会论文集[C];2007年
9 陈运东;;重庆市藻渡水库左岸河间地块渗漏评价[A];2014年全国工程地质学术大会论文集[C];2014年
10 李辉英;羡洪胜;殷长立;张峰;马世芳;;白银厂矿田折腰山矿区深部找矿地质条件的分析[A];中国采选技术十年回顾与展望[C];2012年
相关重要报纸文章 前2条
1 记者徐洁净;按照科学方法浇灌管护的绿地[N];平顶山日报;2009年
2 赵玲玲;中国天山具备找大矿地质条件[N];地质勘查导报;2008年
相关硕士学位论文 前3条
1 罗建军;复杂地质条件下桩基施工关键技术研究[D];武汉工程大学;2015年
2 华明国;基于GIS的小青井田综采地质条件评价[D];辽宁工程技术大学;2009年
3 伍志石;重庆市云阳县凉水井滑坡在库水下降条件下的稳定性分析[D];成都理工大学;2011年
,本文编号:1883320
本文链接:https://www.wllwen.com/jingjilunwen/jianzhujingjilunwen/1883320.html