工程项目造价的动态控制研究
发布时间:2018-06-15 20:09
本文选题:动态控制 + 显著性成本理论 ; 参考:《浙江大学》2015年硕士论文
【摘要】:工程项目的造价控制应遵循动态控制的原则,紧紧围绕投资控制目标进行动态控制,并贯穿工程项目实施的整个过程。工程造价动态控制是在项目实施的各个阶段运用组织、技术、经济和合同等进行工程项目造价的测算和分析,获得建设项目最大的投资效益。 本论文基于工程项目造价控制在实施过程的各个不同阶段都具有动态性,提出在项目的决策阶段、设计阶段及施工阶段都要进行项目造价的动态控制,并对工程不同阶段的造价控制进行具体分析,利用先进技术和手段控制项目成本,提高工程项目在决策阶段、设计阶段和施工阶段的造价控制管理水平,实现项目投资收益最大化。 通过对工程项目决策阶段、设计阶段和施工阶段的造价控制动态研究,推动造价动态控制原理在项目造价管理领域的应用,促进项目造价控制管理方法的丰富和发展,在项目的实施过程中,充分运用造价动态控制的方法,对项目投资按建设程序实行层层控制,保证项目造价不突破批准的投资限额,实现工程项目造价的有效动态控制,最终达到节约资源,控制项目投资的效果。
[Abstract]:The cost control of engineering project should follow the principle of dynamic control, and carry out dynamic control closely around the investment control goal, and run through the whole process of project implementation. The dynamic control of project cost is to calculate and analyze the project cost by using organization, technology, economy and contract in every stage of project implementation, so as to obtain the maximum investment benefit of the construction project. Based on the fact that the project cost control is dynamic in different stages of the implementation process, this paper proposes that the dynamic control of the project cost should be carried out in the decision-making, design and construction stages of the project. The cost control in different stages of the project is analyzed in detail, and the cost control management level of the project in the decision-making, design and construction stages is improved by using advanced technology and means to control the cost of the project. Maximize the investment income of the project. Through the dynamic research on the cost control in the decision-making stage, the design stage and the construction stage of the project, the application of the dynamic cost control principle in the field of project cost management is promoted, and the enrichment and development of the project cost control management method are promoted. In the implementation of the project, the method of dynamic cost control is fully used to control the investment of the project according to the construction procedure, so as to ensure that the project cost does not break the approved investment limit, and realize the effective dynamic control of the project cost. Finally, the effect of saving resources and controlling project investment is achieved.
【学位授予单位】:浙江大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TU723.3
【参考文献】
相关期刊论文 前8条
1 汪应洛,杨耀红;工程项目管理中的人工神经网络方法及其应用[J];中国工程科学;2004年07期
2 杨晓林,郭玉田;基于神经网络的工程估价系统研究[J];哈尔滨建筑大学学报;2002年02期
3 苏振民;基于BP神经网络的工程造价估测方法[J];基建优化;2000年04期
4 刘正庚;石油化工信息化的探讨[J];计算机与应用化学;1998年01期
5 赵峰;;基于BP神经网络的项目投资风险评价[J];建筑经济;2006年10期
6 杨兵;浅谈项目决策与工程造价的关系及影响因素[J];山西建筑;2003年05期
7 何轶彬,陈晓彬,金和平,何文;工程项目成本/进度综合控制方法及应用[J];中国三峡建设;2001年07期
8 罗新星;苗维华;;挣值法的理论基础和实践应用[J];中南大学学报(社会科学版);2003年03期
,本文编号:2023436
本文链接:https://www.wllwen.com/jingjilunwen/jianzhujingjilunwen/2023436.html