当前位置:主页 > 经济论文 > 建筑经济论文 >

天津市排水泵站控制系统的项目管理研究

发布时间:2018-07-03 00:31

  本文选题:泵站 + 自动化 ; 参考:《河北工业大学》2015年硕士论文


【摘要】:我市排水泵站数量多、分布广,管理的方式以传统人工为主。有效率较低、安全性差的缺点,已经不能满足城市发展的需要。随着泵站管理要求的提高,信息化,科学化调度的需求迫切。近些年通过泵站技术改造,泵站的自动化水平已经得到一定发展。但是与此同时在扩大应用时遇到的问题与不足的地方也显现出来,如泵站现场设备的控制与实现远程监测控制,建立自动监控系统等方面,还有很多研究和提高的空间。首先本文通过对目前泵站运行及管理现状的介绍,从项目背景、需求分析,项目选取址,试点工程的设计、计划组织实施以及技术环境效益等几方面完成了对排水泵站自动化控制系统项目的可行性分析。本文介绍了本项目所涉及的项目管理的基础知识,分别从项目实施过程中的过程管理,及项目的计划进度控制、沟通管理等方面论述了在排水泵站自动化控制系统项目中如何实现和控制项目的管理。分析研究了系统项目在实际应用上的可行性及社会、经济及环境效益。最后通过实施前后现状的对比,从项目的运营管理,技术水平、试运营期、社会效益、环境效益等方面完成了对本项目的后评价。
[Abstract]:Our city drainage pump station quantity is many, the distribution is wide, the management way is based on the traditional manual. The shortcomings of low efficiency and poor security have not been able to meet the needs of urban development. With the improvement of pump station management requirement, the demand of informationization and scientific dispatching is urgent. In recent years, through the technical transformation of pumping stations, the automation level of pumping stations has been developed to a certain extent. But at the same time, the problems and shortcomings in expanding the application also appear, such as the control of pumping station field equipment and the realization of remote monitoring control, the establishment of automatic monitoring system, there is a lot of room for research and improvement. First of all, this paper introduces the current operation and management of pumping station, from the project background, demand analysis, project selection site, the design of the pilot project. The feasibility analysis of the project of automatic control system of drainage pump station is completed in the aspects of plan organization and technical and environmental benefit. This paper introduces the basic knowledge of project management involved in this project, including the process management in the course of project implementation, and the control of project schedule. This paper discusses how to realize and control the project management in the project of automatic control system of drainage pump station. The feasibility and social, economic and environmental benefits of the system project are analyzed and studied. Finally, through the comparison of the present situation before and after implementation, the post-evaluation of the project is completed from the aspects of project operation management, technical level, trial operation period, social benefit, environmental benefit and so on.
【学位授予单位】:河北工业大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TU992.25;TU712

【参考文献】

相关期刊论文 前1条

1 王q,

本文编号:2091567


资料下载
论文发表

本文链接:https://www.wllwen.com/jingjilunwen/jianzhujingjilunwen/2091567.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户14825***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com