控规中路网承载力与容积率互动反馈研究
[Abstract]:In the compilation system of urban and rural planning in China, the level of urban master planning corresponds to the special urban comprehensive transportation planning, while the stage of constructive detailed planning has the traffic impact assessment of construction projects, which reflects the importance of urban planning to the coordinated development of transportation and land use, but there is no clear traffic planning in the regulatory detailed planning. In order to coordinate the relationship between traffic and land use, the traffic impact assessment of construction projects has gradually been taken seriously by urban managers, and to some extent, traffic congestion has been alleviated. At the same time, there are many problems. Firstly, the traffic impact assessment of construction projects is in the stage of constructive detailed planning, and the feedback effect of the evaluation results on the intensity of land development is limited in the face of the regulatory detailed planning with statutory status. Secondly, as the principal of the traffic impact assessment of construction projects, developers often think of ways to solve these problems. It is difficult to grasp the actual traffic impact from the overall point of view because of the complexity of urban traffic and the complexity of the traffic impact assessment of construction projects. This paper introduces the core content and key technology of traditional traffic planning into the planning process of traffic control, balances the relationship between traffic supply and demand on the basis of land use planning, and urges the intensity of land development to adapt to the capacity of road network. Traffic is taken as the research object, and the quantitative relationship between road network carrying capacity and volume ratio is established based on the car trip generation rate. According to the different characteristics of background traffic flow, the planning object is divided into new urban development area and old urban renewal area, and the road network is given based on OD back-stepping method and "four-stage" method of traffic demand forecast. The research method of interactive feedback between carrying capacity and volume ratio. For new urban development area, the research idea is to use OD back-stepping method based on the preliminary plan of land use planning, to feedback the maximum car traffic that can be carried by the planned road network back to each planned land block, and to deduce the permission of each block by car trip generation rate. The maximum volume ratio and the adjustment method of unreasonable volume ratio are given, which can provide auxiliary basis for determining the volume ratio in the compilation of control plan. For the old city renewal area, its research ideas draw lessons from the core concept of traffic impact assessment, mainly through the traffic planning "four stages" method to have initially determined the volume ratio of each block of soil index. In this paper, the traffic demand is forecasted by using the planning scheme, and the generated traffic volume is fed back to the planned road network. Through the load level of the road network, the rationality of the preliminary planned volume ratio index is judged, and the adjustment method of the unreasonable volume ratio is also given. The latter is a positive feedback process from the plot rate to the bearing capacity of the road network, both of which realize the bidirectional interactive feedback between the bearing capacity of the road network and the volume rate during the adjustment of the unreasonable volume rate. This paper introduces the compilation process of traffic control plan, realizes the effective control of land development intensity from the angle of traffic supply and demand balance, and provides technical support for the determination of volume ratio index; on the other hand, it promotes the smooth connection between urban comprehensive traffic planning and traffic impact assessment of construction projects, and makes the role of traffic control rules play a full role from the beginning to the next, and finally realizes it. The coordinated development of transportation and land use can effectively cope with urban traffic problems.
【学位授予单位】:山东建筑大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TU984.191
【参考文献】
相关期刊论文 前10条
1 郑猛;张晓东;;依据交通承载力确定土地适宜开发强度——以北京中心城控制性详细规划为例[J];城市交通;2008年05期
2 咸宝林;陈晓键;;合理容积率确定方法探讨[J];规划师;2008年11期
3 许伦辉,徐建闽,周其节;路段通行能力约束下路网最大交通量的确定[J];公路;1997年11期
4 汤宇卿;武一锋;李巧燕;池磊;;一体化交通规划和评价体系的构建——控制性详细规划层面的交通影响评价研究[J];规划师;2013年07期
5 杨云;乔晓青;肖邱瑞;;可持续发展与城市路网交通承载力关系探析[J];重庆交通大学学报(社会科学版);2013年05期
6 傅白白;于善初;;OD反推技术下的高强度开发片区容积率确定方法[J];规划师;2014年10期
7 杨晓萍,杨国志;基于网络最大流的城市道路网容量计算[J];上海公路;2005年02期
8 赵童,徐慰慈;交通影响分析中逆四阶段用地反馈模型探讨[J];同济大学学报(自然科学版);2001年11期
9 杨涛,徐吉谦;运输网络极大流的一种新算法[J];土木工程学报;1991年01期
10 贾顺平;彭宏勤;刘爽;;基于居民出行特性与路网承载力的城市交通状态研究[J];交通运输系统工程与信息;2011年05期
相关会议论文 前1条
1 张晓东;张宇;郑猛;姚智胜;;城市土地使用与交通协同规划编制方法研究[A];城市时代,协同规划——2013中国城市规划年会论文集(01-城市道路与交通规划)[C];2013年
相关硕士学位论文 前1条
1 郑璐;城市单元控规土地利用与交通协调关系研究[D];北京交通大学;2011年
,本文编号:2238508
本文链接:https://www.wllwen.com/jingjilunwen/jianzhujingjilunwen/2238508.html