基于关键链法的项目群进度计划优化研究
[Abstract]:In recent years, in the field of construction project schedule management, (Critical Chain Method, (key chain method) has become a research hotspot. By comparing the key chain method with the traditional schedule planning method, this paper expounds the connotation, theoretical basis and basic idea of the key chain method. The process of applying the key chain method in the project group schedule management is clarified. Firstly, the priority of each project in the project group is determined under the condition of resource constraint. In this paper, a set of project priority evaluation index system is constructed. Using grey relational analysis to determine the priority of each item in the project group; Then, according to the evaluation results of priority, the key chain of each project in the project group is determined in turn, which is mainly based on the critical path method and ACTIM criterion. Finally, the size of the project buffer and the import buffer on the key chain are determined according to the position weight coefficient and the risk elasticity coefficient of each process in the key path of the project. Through the above analysis, this paper optimizes the progress plan of the construction project group by using the key chain. Based on the grey relational analysis, the key chains of three construction projects under resource constraints are determined, and the size of the project buffer and the import buffer on the critical chain are determined. It is concluded that the critical chain method shortens the duration of the project group composed of three projects, and the planned duration of each project is also greatly reduced, which ensures the realization of the optimization goal of the project group schedule plan. The method of this paper is of great practical significance in optimizing the allocation of resources, utilizing resources effectively, honouring the promise of contract on time, quality and quantity, ensuring the economic benefit of the enterprise, improving the customer satisfaction and promoting the brand value of the enterprise itself at the same time.
【学位授予单位】:天津大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TU722
【参考文献】
相关期刊论文 前10条
1 胡晨;徐哲;于静;;基于工期分布和多资源约束的关键链缓冲区大小计算方法[J];系统管理学报;2015年02期
2 李明;徐哲;于静;;基于帕金森定律的关键链缓冲设置方法[J];计算机集成制造系统;2013年12期
3 李海凌;刘克剑;陶学明;;工程项目群资源管理的HTCPN建模与优化[J];控制工程;2013年05期
4 张静文;李若楠;;关键链项目调度方法研究评述综述与评论[J];控制与决策;2013年09期
5 申云;熊建芳;邵景奎;;多项目管理优先级评价指标体系与评价方法研究[J];无锡商业职业技术学院学报;2013年04期
6 张春生;严广乐;;基于资源时间因子的DSM项目群进度优化研究[J];运筹与管理;2013年04期
7 张双甜;李欣兰;;项目群瓶颈资源识别方法[J];工程管理学报;2013年03期
8 别黎;崔南方;赵雁;张小明;;关键链多项目调度中分散式能力约束缓冲设置法[J];管理工程学报;2013年02期
9 耿显民;刘志嘉;;多项目管理中依据资源的马氏链择优[J];系统工程理论与实践;2012年09期
10 李波;翁东风;韦灼彬;;工程进度控制关键链法应用分析[J];工程管理学报;2012年03期
相关博士学位论文 前1条
1 李默;工程施工企业项目组合优选与组织模式研究[D];山东科技大学;2011年
相关硕士学位论文 前3条
1 王续;基于战略视角的建筑企业项目群管理模式研究[D];首都经济贸易大学;2013年
2 艾鑫;多项目管理中资源冲突及优化配置研究[D];重庆大学;2011年
3 赵晓凤;基于多项目管理的战略实施研究[D];天津理工大学;2006年
,本文编号:2316257
本文链接:https://www.wllwen.com/jingjilunwen/jianzhujingjilunwen/2316257.html