矩形顶管施工的环境效应研究
[Abstract]:With the increasing complication of urban underground structure, rectangular pipe jacking, as a kind of underground excavation technology, has the advantages of small disturbance and high space utilization ratio, and is being used more and more in the engineering of connection passage, interchange road, underground integrated pipe corridor and so on. However, the research on the environmental effect of rectangular pipe jacking is still in its infancy. In this paper, based on the project between Hua-Qiang North Station and Huaxin Station of Shenzhen Metro Line 7, the theoretical calculation is used. The environmental effects of rectangular pipe jacking are studied by means of numerical simulation and measured analysis. The main contents are as follows: (1) the tunnel uplift caused by rectangular pipe jacking is calculated by using two-stage analysis method. Under the action of unloading the bottom, side and excavated surface of the pipe jacking, the Mindlin solution is used to obtain the additional load on the tunnel. Then the Winkler foundation beam model is used to simplify the tunnel and solve the equilibrium differential equation. The calculated integral uplift curve of the tunnel is basically consistent with the measured curve. (2) the surface settlement caused by the soil loss caused by the rectangular pipe jacking is calculated by using the stochastic medium method. Peck formula and the calculation of the random medium method under the uniform convergence mode The calculated results tend to be consistent with the increase of buried depth. However, there is a big difference between the results of the model and the non-uniform convergence model. The measured data show that the random medium method is more accurate under the non-uniform convergence mode. (3) during the construction of rectangular pipe jacking, the surface uplift and settlement and tunnel deformation are monitored at high frequency and in a wide range. Pipe-jacking construction only has a greater impact on the tunnel in the lower 15m-20m range. There is a peak region in the uplift curve of the lower tunnel, and the uplift of the tunnel segment mainly occurs between the time node between the excavated surface reaching the tunnel boundary and the time node leaving the tunnel boundary. The cross section of tunnel under the influence of pipe jacking is egg-shaped. At the point on the surface, the process of settlement, uplift and settlement will occur when the pipe jacking passes. (4) the three-dimensional finite element numerical model is established by Plaxis3D, and the soil constitutive model is hardening model. The simulation results are close to the measured results. The simulation results show that the radius of curvature of pipeline, the deformation of tunnel and the radius of curvature are all within the allowable range. The dynamic propulsion of pipe jacking was simulated by the method of stepwise propulsion, and the similarities and differences between the simulated time-history curve and the measured time-history curve were analyzed.
【学位授予单位】:浙江大学
【学位级别】:硕士
【学位授予年份】:2016
【分类号】:TU990.3
【相似文献】
相关期刊论文 前10条
1 王炜健;;不同土质下顶管施工所采用的掘进机[J];科技信息(科学教研);2008年01期
2 赵丙辉;;顶管施工中的质量控制[J];甘肃科技;2008年02期
3 杨传国;;顶管施工中存在问题及应对措施[J];中国新技术新产品;2010年20期
4 方梨梨;;长距离顶管施工对地表扰动的分析[J];山西建筑;2013年21期
5 高乃熙;;土壤对顶管施工的影响[J];市政技术;1981年02期
6 段波;顶管施工的测量与校正[J];安徽建筑;1999年06期
7 苏鹏;;顶管施工在污水厂工程中的应用探讨[J];山西科技;2013年06期
8 张玉生,周明艺;大断面长距离顶管施工工艺及机理分析[J];岩土工程学报;2000年04期
9 乔宏伟,邓志辉;顶管施工中地面沉降的预测[J];西部探矿工程;2000年06期
10 叶树强;长距离顶管施工工程[J];广州建筑;2002年03期
相关会议论文 前10条
1 徐恩涛;项敏;曹凯;;顶管施工在民权中水工程中的应用[A];河南省建筑业行业优秀论文集(2009)[C];2009年
2 牛艳芳;;郑州市索须河顶管施工工艺的设计选择[A];现代建设工程应用技术学术交流会论文集[C];2009年
3 刘振伟;;桐乡尾水外排钱塘江排江工程顶管施工[A];第二届全国地下、水下工程技术交流会论文集[C];2011年
4 席刚;;关于封闭式顶管施工过程遇到障碍物常见处理方案及案例分析[A];第一届中国城市地下工程非开挖技术研讨会论文集[C];2004年
5 王艺翔;伞小雨;;长距离顶管施工测量及纠偏控制[A];水与水技术(第3辑)[C];2013年
6 谭建国;祁志强;何国舟;;注浆加固在顶管施工中的应用[A];第十三届全国探矿工程(岩土钻掘工程)学术研讨会论文专辑[C];2005年
7 朱湖;李攀;;浅谈污水顶管施工的几个关键点[A];土木建筑学术文库(第14卷)[C];2010年
8 熊旺;;大口径玻璃钢夹砂管进行顶管施工可行性试验的应用实践[A];第一届中国城市地下工程非开挖技术研讨会论文集[C];2004年
9 陈铁胜;;在松散砂层中顶管施工的设想[A];中国土木工程学会市政工程分会2000年学术年会论文集[C];2000年
10 张志勇;;复杂环境下大截面矩形顶管施工管线保护技术[A];第二届全国地下、水下工程技术交流会论文集[C];2011年
相关重要报纸文章 前6条
1 本报记者 任佳 通讯员 李颖;科技书写顶管施工新传奇[N];中国建设报;2014年
2 本报通讯员 李颖;挺起顶管施工的脊梁[N];人民铁道;2014年
3 记者 李媛 通讯员 彭力;珠海澳门咸期紧急供水工程创顶管施工新纪录[N];建筑时报;2007年
4 记者 林奕群;海滨路中段改造排水干管昨顶管施工[N];汕头日报;2008年
5 记者 郑海华 通讯员 陈建素;现代“土行孙”地下穿行有法[N];温州日报;2009年
6 记者 李峰;河底管道施工技术获重大突破[N];甘肃日报;2004年
相关博士学位论文 前1条
1 冯海宁;顶管施工环境效应影响及对策[D];浙江大学;2003年
相关硕士学位论文 前10条
1 陈杰;四孔并行矩形顶管施工力学效应研究[D];西南交通大学;2015年
2 曹明明;顶管施工引起的地表沉降问题研究[D];河南工业大学;2016年
3 冼家驹;密排管幕群顶管施工引起的地面变形研究[D];广东工业大学;2016年
4 刘营;顶管施工对周围土体扰动范围影响研究[D];郑州大学;2016年
5 孙宇赫;顶管施工岩土环境效应监测与控制技术研究[D];郑州大学;2016年
6 王素伟;特大管径长距离机械顶管施工技术应用研究[D];郑州大学;2016年
7 吴勇;矩形顶管施工的环境效应研究[D];浙江大学;2016年
8 焦永强;顶管施工与原体测试[D];西安建筑科技大学;2002年
9 余芳;顶管施工引起地面沉降的分析研究[D];上海交通大学;2009年
10 方梨梨;顶管施工参数的地层适应性问题研究[D];广州大学;2011年
,本文编号:2351036
本文链接:https://www.wllwen.com/jingjilunwen/jianzhujingjilunwen/2351036.html