当前位置:主页 > 经济论文 > 建筑经济论文 >

基于数值模拟的深基坑不同组合支护形式对比分析

发布时间:2019-03-20 19:38
【摘要】:随着城市建设中地下空间开发利用愈来愈多,深基坑工程变得越来越复杂,对其支护形式的研究也面临前所未有的挑战。以石家庄市某深基坑工程为例,采用非线性有限元方法对桩锚-土钉墙分段组合和桩锚-土钉墙分级组合两种不同组合支护形式下的坡顶水平位移、竖向位移、深层土体位移进行分析。对比发现,桩锚-土钉墙分级支护较桩锚-土钉墙分段支护在坡顶水平位移、竖向位移、深层土体位移方面控制效果更佳。
[Abstract]:With the development and utilization of underground space in urban construction, the deep foundation pit engineering has become more and more complex, and the research on its supporting form is also facing unprecedented challenges. Taking a deep foundation pit project in Shijiazhuang City as an example, the nonlinear finite element method is used to study the horizontal displacement and vertical displacement of slope top under two different combination supporting forms: pile anchor-soil nailing wall segment combination and pile anchor-soil nail wall classification combination. The displacement of deep soil is analyzed. It is found that the pile anchor-soil nailing wall classification support is better than the pile anchor-soil nail wall segment support in controlling the horizontal displacement, vertical displacement and deep soil displacement of the slope top.
【作者单位】: 山东金城建设有限公司;中国矿业大学;
【分类号】:TU753

【相似文献】

相关期刊论文 前10条

1 岳菊红,王海霖;深基坑施工中的监测项目及其特点[J];中州煤炭;2003年03期

2 卢一凡;深基坑工程管理浅谈[J];长江建设;2004年01期

3 黄宏伟,边亦海;深基坑工程施工中的风险管理[J];地下空间与工程学报;2005年04期

4 钟才根;刘慧霞;;深基坑工程风险源分析及防范对策[J];建设监理;2005年06期

5 何显舜;莫振瀚;;浅谈深基坑的安全施工[J];四川建材;2006年03期

6 陈芳;党淑凤;;深基坑工程环境安全风险的技术控制[J];安装;2007年02期

7 王伟;刘征;;上海市区深基坑工程风险管理——上海恒升名邸深基坑工程[J];上海建设科技;2007年06期

8 陈军;;风险管理理论在深基坑工程中的应用[J];安徽建筑;2008年06期

9 杨鹏;;深基坑工程风险应对策略分析[J];中华建设;2008年12期

10 吴忠怀;;论某花园广场的深基坑支护应用[J];建材与装饰(下旬刊);2008年01期

相关会议论文 前10条

1 施振东;;深基坑工程风险管理浅析[A];地基基础工程与锚固注浆技术:2009年地基基础工程与锚固注浆技术研讨会论文集[C];2009年

2 李,

本文编号:2444565


资料下载
论文发表

本文链接:https://www.wllwen.com/jingjilunwen/jianzhujingjilunwen/2444565.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户c8cfa***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com